Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

Campus Steam System Repairs 2022
Alteration
Bidding
$365,000 est. value
Athens, OH 45701

Heat Pump Replacement - Independence Square
Alteration
Bidding
Wellsville, OH

Repairs of Heating, Plumbing, AC and Mechanical Systems for 2021, 2022 and 2023
Post-Bid
Lima, OH

The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps
Post-Bid
$25,000 to $100,000 est. value
Cleveland, OH 44114

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Recreation Center - Lobby and Gym HVAC Modifications
Results
Less than $210,000 est. value
Cleveland, OH 44115

Clinton Massie Chiller Replacement
Alteration
Bidding
Clarksville, OH 45113

HVAC and Mechanical Products
Term Contract
Post-Bid

Wolstein Cooling Tower Repair Phase 1
Results
Cleveland, OH 44115

Great Oaks Project Number 2020.01.062 Live Oaks Campus Renovation and Addition Pre-Purchase of Air Handling Units
Post-Bid
Less than $2,300,000 est. value
Milford, OH 45150

Infrastructure Upgrades to ECU Plant - Chiller 4 Replacement
Results
Less than $369,500 est. value
Cincinnati, OH

HVAC Cleveland Coast Guard
Post-Bid
Cleveland, OH 44114

OU Alden Library Air Handler Replacement Upgrades
Results
$1,020,000 est. value
Athens, OH 45701

Chiller Replacement
Post-Bid
Barnesville, OH 43713

Last Updated 02/10/2022 09:08 AM
Project Title

Wilbur L Berkey Fieldhouse HVAC/Boiler and Door and Window Replacement

Physical Address View project details and contacts
City, State (County) Smithville, OH   (Wayne County)
Category(s) Single Trades
Sub-Category(s) HVAC, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and installation of existing HVAC/Boiler equipment, removal and installation of existing hollow metal doors and windows, hazardous abatement work, electrical demolition and new electrical work, acoustical ceiling work, exterior concrete work, door security work, and new aluminum window/exterior storefront systems and doors.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents