Similar Projects
Robbins Lodge Equestrian Center Improvements - PW13 - Town of Davie
Infrastructure, Renovation
Conception
$2,400,000 CJ est. value
Davie, FL 33330

George T. Lohmeyer Sludge Pump Rehabilitation - FY20221035 - City of Fort Lauderdale
Renovation
Conception
$2,893,132 CJ est. value
Fort Lauderdale, FL 33316

Undergrounding of Beach Electrical Services
Infrastructure
Design
$246,489 CJ est. value
Dania Beach, FL 33004

Lift Station # 2 Rehabilitation
Renovation
Bidding
$1,746,000 CJ est. value
Hallandale Beach, FL 33009

Lift Stations 128 and 210 Rehabilitation
Renovation, Infrastructure
Bidding
$2,158,059 CJ est. value
Sunrise, FL 33351

Utility Analysis Zone 108
New Construction, Infrastructure
Post-Bid
$21,504,000 est. value
Pompano Beach, FL 33060

D/B - Design Build Flagler Village New Pumping Station A-24
New Construction
Post-Bid
$540,000 est. value
Fort Lauderdale, FL

Sewer Lift Station Rehabilitation and Repair
Term Contract
Results
FL

Replacement of Lift Station - 15
New Construction
Results
Pembroke Park, FL 33023

Lift Station #3 Improvements
Renovation
Bidding
$1,225,000 CJ est. value
Hallandale Beach, FL 33009

Lift Station Rehabilitation and Repair Services
Renovation
Post-Bid
Sunrise, FL

Sewage Lift Station Rehabilitation At Station Ft. Lauderdale
Renovation
Results
Dania Beach, Fort Lauderdale, FL 33004

Lift Station #1 - Egret Tri-plex Submersible Lift Station Improvements
Renovation
Bidding
$200,000 CJ est. value
Hallandale Beach, FL 33009

River Oaks Pump Station
Infrastructure
Post-Bid
$8,745,000 CJ est. value
Fort Lauderdale, FL 33315

Lift Station No. 3 Replacement Project
Renovation
Results
$790,000 est. value
Plantation, FL 33324

Last Updated 10/13/2022 01:34 PM
Project Title

Victoria Park A-17 Basin Pump Station Rehabilitation - FY20150212 - City of Fort Lauderdale

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33301   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $6,318,516 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides for the necessary point repairs, road restoration, landscaping, and rehabilitation of mainline sewers. City staff will employ the use of trenchless technologies to repair sewer system components such as lining of gravity sewers, manholes, and sewer laterals. Work also includes a pre- and post- Closed Circuit Television (CCTV) survey, flow monitoring, traffic control, and site restoration in Victoria Park, Basin A -17. This project is part of the Wastewater Conveyance System Long Term Remediation Program. As of October 13, 2022, this project is currently in the City of Fort Lauderdale's FY 2023-2027 CIP. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents