Similar Projects
Camino Coyote Lane
Results
$701,403 est. value

USPS Driveway Improvements
Infrastructure
Results
$200,000 est. value
Rio Rancho, NM

Elk Trail and Black Bear Road - Culvert Replacement
Infrastructure
Results
Jemez Springs, NM 87025

Design Services and Corridor Study for Idalia Road
Results
Rio Rancho, NM

Tierra Madre Road Improvements
Infrastructure
Post-Bid
Placitas, NM

Idalia Road and Loma Colorado Boulevard Intersection Improvements
Infrastructure
Results
Rio Rancho, NM

Bituminous Paving
Infrastructure
Post-Bid
Rio Rancho, NM

Residential Streets Rehabilitation
Post-Bid
Cochiti, NM

Base Course Fill
Post-Bid

Rainbow Boulevard Improvements Project
Infrastructure
Results

Veranda Road Safety Improvements
Results
Rio Rancho, NM 87124

Roadway Reconstruction, Lighting, Signalization, ITS
Results
NM

Loma Colorado ADA Ramp Remediation Project
Infrastructure
Results
$105,000 est. value
Rio Rancho, NM 87124

Old Highway 44 Roadway and Bridge Reconstruction
Renovation, Infrastructure
Post-Bid
$1,100,000 est. value
Bernalillo, NM 87004

Construction of King Boulevard Expansion
Infrastructure
Post-Bid
$5,300,000 est. value
Rio Rancho, NM 87144

Reported 06/24/2022 12:00 AM
Project Title

Design-Build - Pavement Resurfacing and Safety Improvements to Indian Service Route (ISR) 88 (Rio Grande Road)

Physical Address View project details and contacts
City, State (County) Santo Domingo Pueblo, NM 87052   (Sandoval County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement resurfacing and safety improvements to Indian Service Route (ISR) 88 (Rio Grande Road) extending through the existing urban section and terminating at the transition to rural section approximately 2,860 linear feet. The project is essentially a road maintenance project and the design will support these efforts along with installation of speed humps, drainage structure improvement

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents