Similar Projects
Interstate 81 over West Foothills Drive
Infrastructure
Conception
$6,958,544 CJ est. value
Drums, PA 18222

SR 315 over Reading Blue Mt and Northern Railroad
Infrastructure, Renovation
Conception
$2,950,000 CJ est. value
Pittston, PA 18640

SR 1012 over Tributary Harvey's Creek
Demolition, New Construction, Infrastructure, Renovation
Design
$750,000 CJ est. value
Jackson Township, PA 18708

I-80 EB over I-81 NB/SB
Infrastructure
Design
$16,152,468 CJ est. value
Butler Township, PA 18222

Construction of Aviation Fuel Farm Overfill and Fuel Pump Replacement
Renovation, Infrastructure
Bidding
$575,000 CJ est. value
Pittston, PA 18641

Site and Utility Relocation Work in Allen Street
Infrastructure
Post-Bid
Hazleton, PA 18201

AMR 46 Birch Avenue Nanticoke, City of Nanticoke, Luzerne County
Infrastructure
Post-Bid
$100,000 to $200,000 est. value
Nanticoke, PA

World-Wide Water Storage Tank Remediation
Term Contract
Results

2020-2021 Capital Fund Program Modernization Projects - Site Improvements at Nanticoke Terrace Lower
Infrastructure
Results
Nanticoke, PA

New Jersey Central Railroad Train Station Improvement
Renovation - 32,000 SF
Construction
$1,200,000 est. value
Wilkes-Barre, PA 18704

Loomis Roundabout Improvement Project
Construction
Ashley, PA 18701

I-80 over Lehigh River Bridge Project - Pennsylvania Department of Transportation
Demolition, New Construction, Infrastructure
Pending Verification
$52,000,000 CJ est. value
White Haven, PA 18661

Hazelton Beltway Center
New Construction, Infrastructure - 3,948,000 SF
Pending Verification
$426,000,000 CJ est. value
Hazle Township, PA 18202

Rogers Avenue over Solomon Creek
Demolition, New Construction, Infrastructure
Conception
$1,100,000 CJ est. value
Ashley, PA 18706

I-81 NB Grinding Luzerne
Infrastructure
Design
$205,800,000 CJ est. value
Mountain Top, PA 18707

Last Updated 11/30/2022 09:49 AM
Project Title

Rehabilitation of the Equalization Tank MAJSA, Waste Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Mountain Top, PA 18707   (Luzerne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $115,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work comprises of the rehabilitation of the equalization tank, including cleaning and sealing of the existing cracks and joints, workmanship and all appurtenances for a complete job in accordance with the Contract Documents. The Work to be constructed hereunder is located within the MAJSA Waste Water Treatment Plant, in the Township of Dorrance, Luzerne County. The Contractor will be responsible for obtaining and paying for any required permits. The Work is to take place after March 15, 2023. Question Deadline 11/11/2022 at 11:00 AM ET

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents