Similar Projects
HVAC and Electrical Upgrades
Alteration
Bidding
Centreville, IL

2021/2022 MFT General Maintenance Program - Sidewalk Replacement
Infrastructure
Bidding
$75,000 to $90,000 est. value
Mascoutah, IL

Generator
Post-Bid
Fairview Heights, IL 62208

Bi-Fuel Installation
Post-Bid
Belleville, IL 62225

Drainage Improvements PY19
Renovation
Results
Less than $70,000 est. value
Alorton, IL 62207

Juniper Drive and West Madison Drive Area Creek Bank Stabilization
Results
O'Fallon, IL

Replace Mechanical And Electrical Systems, Improve Fire Safety And Security
Renovation, Infrastructure, Alteration
Bidding
Less than $700,000 est. value
Collinsville, IL 62234

Warehouse Lights
Post-Bid
IL 62225

Milburn Estates Drainage Improvements
Results
O'Fallon, IL 62269

Flood Mitigation Services - Scott AFB
Post-Bid
Belleville, IL 62225

Electrical Upgrades at the Bowman Pump Station on Exchange Avenue in East St. Louis
Results
IL

Global UPS Maintenance
Post-Bid
Belleville, IL 62225

Maintenance Grant Lighting Upgrades
Results
O'Fallon, IL

Furnish Pipe Culverts, Corrugated Steel Culvert Pipe
Post-Bid
Belleville, IL

Solar Energy Grant and Roof Mounted System
Alteration
Results
Caseyville, IL

Last Updated 08/09/2021 09:40 AM
Project Title

Repair Plumbing, Drainage, Lighting

Physical Address View project details and contacts
City, State (County) IL 62205   (Saint Clair County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Plumbing, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: The scope of work provides for upgrading the plumbing systems at the Readiness Center including replacing domestic plumbing piping, fixtures, and drains, upgrading restrooms and showers for ADA, replacing water fountains, hot water heaters, and sewer and sanitary line upgrades. The scope of work also provides for upgrading the site storm water drainage as well as the domestic water and sanitary sewer service, replacing emergency exit and shower lights, and installing lighting controls throughout the facility.

Details

Division 02 - Existing Conditions, Asbestos Remediation, Asbestos Abatement.
Division 03 - Concrete, Cast-in-Place Concrete, Miscellaneous Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Metal Doors and Frames, Hollow Metal Doors and Frames, Door Hardware.
Division 09 - Finishes.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories.
Division 12 - Furnishings, Casework, Countertops, Simulated Stone Countertops.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 32 - Exterior Improvements, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents