Similar Projects
Reunion Ridge Filing No. 1 District Improvements
Post-Bid
Less than $13,000,000 est. value
Centennial, CO

Arapahoe County Justice Center West Employee Parking Lot Slope Stabilization and Full Depth Reclamation
Post-Bid
Centennial, CO 80112

Rehabilitating Curb Ramps on SH83, SH86, SH85 and I-25
Results
$1,000,000 to $5,000,000 est. value

Orchard Road Trail
Results
$350,000 to $400,000 est. value
Centennial, CO 80112

Greenwood Gulch Undercrossing Improvements
Post-Bid
Greenwood Village, CO

Ramp Safety Improvements at the Southbound I-225 at Parker Road
Results
$1,000,000 to $5,000,000 est. value
CO

Greenwood Gulch Undercrossing
Post-Bid
Centennial, CO 80111

Englewood Recreation Center Water Main, Fire Hydrant Assembly and ADA Ramp Installation
Results
Englewood, CO 80110

University Boulevard (SH177) Sidewalk Infill
Results
Greenwood Village, CO 80112

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

2020 Concrete Catch-Up Program
Results
Less than $420,891 est. value
Centennial, CO

2019 CDBG Shepperd Avenue Project
Results
Less than $323,333 est. value
Littleton, CO 80120

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Lone Creek Regional Trail Phase 1A
Results
Less than $1,004,305 est. value
Centennial, CO 80112

Englewood Service Center Drainage and Parking Lot Improvements
Results
Less than $500,000 est. value
Englewood, CO

Reported 09/18/2020 12:00 AM
Project Title

Arapahoe County Covered Walkways

Physical Address View project details and contacts
City, State (County) Centennial, Littleton, CO 80120   (Arapahoe County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified professional contractors for the purpose of designing, permitting, providing, and installing covered walkways at multiple facilities in Arapahoe County. Construction MUST BE completed prior to December 15, 2020 to meet funding requirements. To Provide and install a covered walkway at each of the following facilities: 1. Arapahoe Plaza District Courts, 1790 W Littleton Blvd., Littleton CO (AHJ Littleton) 2. Arapahoe Plaza Human Services, 1690 W Littleton Blvd., Littleton CO (AHJ Littleton) 3. Centrepoint, 14980 E Alameda Parkway, Aurora CO (AHJ Aurora) 4. Arapahoe County Justice Center, 7325 S Potomac St., Centennial (AHJ Centennial) 5. Lima/Centennial DMV, 6954 S Lima St., Centennial CO (AHJ Arapahoe County)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents