Similar Projects
Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Hotchkiss Road Hot Mix Asphalt & Shouldering
Post-Bid
Strum, WI 54770

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Galesville - Whitehall, STH 95 East Junction
Results
Galesville, Whitehall, WI 54630

Thompson Road Hot Mix Asphalt & Shouldering
Renovation
Post-Bid
Strum, WI

Centerville - Independence, STH 35 to Swenson Lane
Results
Centerville, Independence, WI

Thompson Road Improvements
Post-Bid
WI

Road Improvements
Results
Eleva, WI

2021 Asphalt Paving/Curb and Gutter
Infrastructure
Post-Bid
Trempealeau, WI 54661

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2021 Chip Sealing
Infrastructure
Post-Bid
Trempealeau, WI

Osseo 5th St Neighborhood Revitalization CDBG-PF Improvements
Results
Osseo, WI 54758

Trempealeau - Fountain City, Tremp River E. Channel Bridge
Results
Fountain City, Trempealeau, WI

2021 Town Road Improvement - Eide Lane
Results
Eleva, WI 54738

2021 Sewer and Water Replacement Pearl Street
Infrastructure
Results
$450,000 est. value
Arcadia, WI 54612

Reported 08/10/2021 12:00 AM
Project Title

Local Road Improvement Project (LRIP)

Physical Address View project details and contacts
City, State (County) Ettrick, WI 54627   (Trempealeau County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Reconditioning of approximately 800 feet of Heimdahl Lane.Work to be provided will consist of complete pulverization of existing structure, furnish and replace with a 10x60 galvanized culvert with riprap, widen to 24 feet, 20-foot travel way and 2-foot shoulders and furnish three-inch (3-inch) of crushed rock base. Project to be completed by August 31, 2021.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents