Similar Projects
Public Safety Building - PUBSF 24-01 - City of Waukee
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 70th to 72nd - WA08-01 - City of Urbandale
Infrastructure
Conception
$344,500 CJ est. value
Urbandale, IA 50323

Cove at Kettlestone - Lots 2 & 3
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Waukee, IA 50263

Ashley Acres
New Construction, Infrastructure
Design
$70,000,000 CJ est. value
Waukee, IA 50263

Bridge Replacement - PPCB - I-80
Demolition, New Construction, Infrastructure
Bidding
$30,000,000 CJ est. value
Adel, IA 50003

New Concessions Building - General Construction , Mechanical and Electrical
New Construction, Renovation, Infrastructure
Post-Bid
$800,000 CJ est. value
Van Meter, IA 50261

RFQ Design - Satellite Maintenance Facility at 170th Street and Waterford Road
New Construction, Infrastructure
Post-Bid
$250,000 CJ est. value
Waukee, IA 50263

North West Meredith Drive Overlay
Infrastructure
Results
$645,407 est. value
Waukee, IA

Waukee Schools 2022 Playground Improvements
Infrastructure
Results
$1,059,745 CJ est. value
Waukee, IA 50263

The Iowa Clinic / Waukee
New Construction, Infrastructure - 40,000 SF
Construction
$23,000,000 CJ est. value
Waukee, IA 50263

Dupaco Community Credit Union / Waukee
New Construction, Infrastructure - 6,400 SF
Pending Verification
$1,500,000 CJ est. value
Waukee, IA 50263

Fourth Street Park Building - City Of Waukee
New Construction, Infrastructure - 2,373 SF
Pending Verification
$18,736,000 CJ est. value
Waukee, IA 50263

Monroe Court Water Main: 72nd to Roseland - WA18-01 - City of Urbandale
Infrastructure
Conception
$424,000 CJ est. value
Urbandale, IA 50323

James Pointe Plat 3 Lot 1 (Troy Plex)
New Construction, Infrastructure - 46,800 SF
Design
$5,000,000 CJ est. value
Waukee, IA 50263

New Hope Church Phase III
New Construction, Infrastructure
Post-Bid
$200,000 CJ est. value
Adel, IA 50003

Last Updated 07/20/2023 02:38 PM
Project Title

Diamondhead Lake Rural Improvement Zone 2023/2024 Dredging Project

Physical Address View project details and contacts
City, State (County) Dexter, IA 50070   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

The selected Vendor, if any, shall remove silt and perform other associated work at Diamondhead Lake using a dredge, workboats and other equipment owned by the RIZ and Long Branch Maintenance Corporation "LBMC". Such work shall commence as soon as practical in 2023 and shall be completed by no later than June 30, 2024. The Vendor shall be compensated on the basis of the number of cubic yards dredged during each month related to the total removal of not less than 60,000 cubic yards of sediment from the Southern basin and Horseshoe Cove areas. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to rejectany or all bids. Any proposals received after such time shall not be evaluated for award. Therefore, each Bidder must make adequate allowance for the time required for delivery. No proposal submitted by oral, facsimile, telephonic/telegraphic or electronic methods will be considered. Each Bidder shall accompany the Bid with a Bid security, in a separate envelope, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of the contract corporate surety bond or bonds, acceptable to the Owner, for the faithful performance of the contract, in an amount equivalent to one hundred percent of the amount of the contract. The bidder's security shall be in an amount equivalent to five percent (5%) of the bid amount, and shall be in the form of a cashier's or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Iowa or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner. Questions regarding the project should be received in writing by 10:00 a.m. on or before July 14, 2023 (6 days in advance of the bid due date) at said address or via email to garyneimanis@gmail.com. Such work shall commence as soon as practical in 2023 and shall be completed by no later than June 30, 2024

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents