Similar Projects
PMC Property Group - Mixed Use
New Construction - 3,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Columbia, SC

Hyatt Regency Hotel
New Construction
Conception
$52,000,000 est. value
Columbia, SC

The Edge
New Construction - 355,000 SF
Design
$70,000,000 est. value
Columbia, SC 29201

The Pointe at Elmwood
New Construction - 65,123 SF
Design
$11,450,241 est. value
Columbia, SC

Village at Rivers Edge - Phase III
New Construction
Post-Bid
Columbia, SC 29203

Babcock Building Apartments
Renovation - 146,000 SF
Post-Bid
Columbia, SC 29201

214 Kitchen and Bath Renovations - St. Andrew Terrace
Renovation
Results
Columbia, SC

Kitchen and Bath Renovations - Fontaine Place
Renovation
Results
Columbia, SC 29223

Cardinal Crossing & The Cardinal
New Construction - 42,000 SF
Construction
$60,000,000 est. value
Forest Acres, SC 29206

Devine Station Apartments
New Construction - 122,260 SF
Construction
$3,000,000 est. value
Columbia, SC

Hilton Hotel
New Construction
Conception
Columbia, SC

Proffitt Dixon Mixed Use at Bullstreet
New Construction - 65,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Columbia, SC

Affordable Suites
New Construction - 49,932 SF
Post-Bid
$5,000,000 est. value
Columbia, Irmo, SC 29212

Farrow Road Development Opportunity
Results
Columbia, SC 29203

Reign at Williams-Brice Stadium - Vertical
New Construction - 24,833,921 SF
Construction
Columbia, SC

Reported 04/24/2019 12:00 AM
Project Title

Vertical Development Opportunity Regarding the Development of Air Rights above Lady Street Parking Deck

Physical Address View project details and contacts
City, State (County) Columbia, SC   (Richland County)
Category(s) Commercial, Residential
Sub-Category(s) Apartments/Condominiums, Hotel/Motel, Office
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. The developer must demonstrate sustainable, innovative and exciting development opportunities for the project site. 2. Quality of the proposed building design and its fit with the surrounding urban fabric (should demonstrate an understanding of City of Columbia design guidelines and complement the character of the Business District) 3. Developer must commit to construction of parking necessary to support the project as well as an additional level of public parking needed to better support the demands of the surrounding area
Details
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Rugs and Mats, Office Furniture, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents