Similar Projects
2022 Watermain Replacement - City of Lakewood
Infrastructure
Conception
$6,750,000 est. value
Lakewood, OH

Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

SR 17 - Roadway Minor Rehab
Infrastructure
Design
$10,400,000 est. value
Cleveland, OH

Re-Bid Multi-Street Reconstruction Phase VI and Tinker's Creek Water Main Replacement
Infrastructure
Bidding
$3,461,179 est. value
Garfield Heights, OH

Downtown Development Site Improvements
Infrastructure
Bidding
$1,750,000 est. value
Lakewood, OH 44107

Hotel Road Rehabilitation Project
Post-Bid
Cleveland, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Lane Marking Paints and Related Equipment
Results
Cleveland, OH 44114

Design Services - Chagrin Boulevard Resurfacing Project
Results
Less than $2,659,996 est. value
Shaker Heights, OH 44118

SR 134 - Bridge Preservation
Renovation, Infrastructure
Design
$530,000 est. value

2022 Asphalt Road Maintenance and Repairs
Infrastructure
Bidding
$500,000 est. value
Independence, OH

Redevelopment of 3568 Lee Road
Infrastructure
Post-Bid
Shaker Heights, OH 44120

Shannon Road Resurfacing and Waterline Replacement
Results
Cleveland Heights, OH 44118

Ralph Conti Way and Rocket Place Roadway Improvements
Infrastructure
Bidding
$220,000 est. value
Chagrin Falls, OH

Sign Supports, Roll-Up Signs, Rigid Signs, And Type Iii Baricades
Infrastructure
Post-Bid

Last Updated 06/28/2022 12:23 AM
Project Title

Middlebrook Boulevard Reconstruction Project

Physical Address View project details and contacts
City, State (County) Brook Park, OH 44142   (Cuyahoga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Highway Signs/Guardrails/Barriers, Paving/Reconstruction, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract consists of the removal and replacement of approximately 415 feet of Middlebrook Boulevard from the intersection of Havendale Drive to Heatherwood Drive. The pavement will be replaced with reinforced concrete pavement on new compacted aggregate base. New curb, underdrains, pavement markings, catch basin repairs, and sewer repairs are included in the work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents