Similar Projects
Boos Recreation Center HVAC Phase 1 Upgrades
Alteration
Bidding
$325,000 est. value
Jackson, MI

Commercial RoofTop Air Conditioning Units (6) Replacement
Alteration
Bidding
Dearborn, MI

Weather Sealing of Roof at Fire Station 2
Post-Bid
Farmington Hills, MI 48336

District-Wide Vertical Unit Ventilators
Post-Bid
Westland, MI 48185

HVAC Services
Results
Howell, MI

St. Louis Correctional Facility - Various HVAC Upgrades
Results
Saint Louis, MI

2021 Bond Program - Bid Package 02 - Oak Park High School - HVAC Upgrades
Alteration
Bidding
Oak Park, MI 48237

Roof Replacement of Picnic Station at Pine-Linden Park
Post-Bid
Dearborn, MI 48124

Kemp Wing Roof Replacement Project
Results
Flint, MI 48507

Loy Norrix High &Kalamazoo Central High Chiller Installation
Alteration
Bidding
Kalamazoo, MI

Skylight Flashing Repairs at DPW Yard
Post-Bid
Dearborn, MI 48120

EOC HVAC
Results
Less than $18,841 est. value
West Olive, MI 49460

Sacred Heart Church
Alteration
Bidding
L'Anse, MI 49946

East Lansing Public Library HVAC Upgrade and Site Improvements
Post-Bid
East Lansing, MI 48823

Fraser Senior Activity Center RTU Replacement Project
Results
Less than $33,210 est. value
Fraser, MI 48026

Reported 02/17/2022 12:00 AM
Project Title

HVAC and Roof Upgrades

Physical Address View project details and contacts
City, State (County) Quincy, MI   (Branch County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 01/27/22
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes removing existing HVAC equipment from approximately15 classrooms, removing several roof top units and removing approximately 15,000 SQFT of roofing and insulation. The work includes installing a new membrane roof with new insulation, new HVAC equipment for the classrooms, and new RTU’s, along with associated piping and electrical systems.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents