Similar Projects
9 Mile Pump Station Design Project
Renovation
Bidding
Clinton Township, MI

Replacement Sump Pumps At Townsend Towers
Renovation
Bidding
Dearborn, MI

Cyl Tec Pump Station and WWTP Actuator Valve Replacement
Post-Bid
Tecumseh, MI

Booster Pump Station Repairs and Upgrades: Phase 1 / Phase 2
Post-Bid
Ann Arbor, MI

Eight Mile Road Pump Station Aboveground Diesel Storage Tank
Results
Less than $142,900 est. value
Waterford, MI

Fairview Sewage Pumping Station Improvements
Results
Detroit, MI

Pump Station Replacement
Bidding
Oscoda, MI

Pump Station Improvements
Post-Bid
Less than $750,000 est. value
Brooklyn, MI

Replacement of Water Pump at East Pump Station
Results
Flint, MI

Hvac Improvements Oakwood CSO Facility - 1
Renovation
Bidding
Detroit, MI

Charter Township of West Bloomfield Lift Station 1 Site Improvements and Upgrade
Post-Bid
MI

Northern Sanitary Pump Station Rehabilitation
Results
Port Huron, MI

Clio Pump Station Rehabilitation
Bidding
Less than $100,000 est. value
Clio, MI 48420

Elementary Gross Motor Room Overhead Lift System
Post-Bid
Traverse City, MI 49686

Wastewater Capital Improvements
Results
Less than $100,000 est. value
Cassopolis, MI 49031

Last Updated 04/01/2021 10:09 AM
Project Title

Wastewater System Improvements – Lift Station No. 79

Physical Address View project details and contacts
City, State (County) New Buffalo, MI   (Berrien County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: • Removal of the existing permanent standby generator and abandoned motor control center. • Installation of new permanent standby generator. • Construction of concrete slab and grating at influent chamber. • All associated equipment, mechanical, electrical, and controls. Including all necessary appurtenances and restoration

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents