Similar Projects
I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Bidding
$30,000,000 est. value
OR

I-84: Multnomah Falls - Toothrock Tunnel - Cascade Locks
Infrastructure
Bidding
$10,000,000 to $20,000,000 est. value
OR

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Post-Bid
Hood River, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

US20: 53Road Avenue - East of 60th Avenue (Sweet Home) Section of the Santiam Highway
Infrastructure
Bidding
$1,000,000 to $2,000,000 est. value
OR

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Pruner Road Intersection Improvements
Infrastructure
Bidding
$2,000,000 est. value
Roseburg, OR

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

OR 214 - Johna Ln. - Fenne Ln. (Silverton) Sec. Silver Creek Falls Vidal Francis, Pm
Infrastructure
Results
$500,000 to $1,000,000 est. value
Silverton, OR

Fairview Creek Pipe Culvert Joint Repair
Infrastructure
Post-Bid
Gresham, OR

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

Last Updated 12/28/2021 07:29 AM
Project Title

NW Cornell Road - NW 102nd Avenue to NW 113th Avenue

Physical Address View project details and contacts
City, State (County) OR   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will construct the following for Washington County: 1. Remove existing pavement, drainage structures, and other improvements along NW Cornell Road from NW 102nd Avenue to NW 113th Avenue. 2. Perform grading operations along the above alignment as necessary to provide new improvements. 3. Construct new storm sewer, water mains and service connections, sanitary sewer mains and sanitary laterals, curb and gutter, driveways, pavement, and retaining walls along the above alignment. 4. Perform grading and stormwater structure installation in an existing water quality pond as necessary to provide new improvements. 5. Install illumination, signals, signing, and striping along the above alignment. 6. Perform additional and Incidental Work as called for by the Specifications and Plans.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents