Last Updated | 07/18/2023 12:14 PM |
Project Title | Installation of Water Bottle Refill Stations - Package 7, Various Schools |
Physical Address | View project details and contacts |
City, State (County) | Boston, MA 02203 (Suffolk County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected January 2024 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $825,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 06/19/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All plumbing bids must carry $215,000 for the electrical filed sub bids. A price adjustment will be made to match the actual electrical filed sub bid price that is selected after reopening. Demolition of existing drinking fountains or sinks for replacement with water bottle refill stations and the installation of water bottle refill stations at new locations without existing drinking water infrastructure. All units will be mounted on phenolic enclosures or panels. PROJECT LOCATIONS: 1. Lyon High School - 95 Beechcroft St., Brighton, MA 02135 2. Lyon K-8 - 50 Beechcroft St., Brighton, MA 02135 3. Blackstone Elementary - 380 Shawmut Ave., Boston, MA 02118 4. Dudley St. Neighborhood School - 6 Shirley St., Roxbury, MA 02119 5. Taylor Elementary - 1060 Morton St., Mattapan, MA 02126 6. Tech Boston Academy - 9 Peacevale Rd., Dorchester, MA 02124 7. Brighton High School - 25 Warren St., Brighton, MA 02135 8. Pauline Shaw Elementary - 429 Norfolk St., Dorchester, MA 02124 9. Tynan Elementary - 650 E. Fourth St., South Boston, MA 02127 10. Joseph Lee School - 155 Talbot Ave, Boston, MA 02124 For information specific to this particular IFB, please submit questions in writing to Audrey Ng, Water & Sustainability project manager at ang@bostonpublicschools.org The Work of Project is defined by the Contract Documents and consists of the following: 1. Demolition of existing water fountains. Covering demolition site with a panel if the unit will not be replaced. 2. Roughing of existing plumbing to serve new water bottle refill stations at new and existing locations. 3. All drains must be commercially snaked and tested to confirm water can flow for at least 20 minutes. 4. Running new circuits to serve water bottle refill stations where service was not previously existing. 5. Mounting of phenolic enclosures or panels. Specific dimensions to be confirmed onsite by contractor. 6. Installation of new water bottle refill stations Address questions to Audrey Ng, Water & Sustainability Project Manager, ang@bostonpublicschools.org |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |