Similar Projects
K-7 Building Addition - Brooke Charter School
Addition - 16,450 SF
Conception
Less than $1,300,000 est. value
Boston, MA 02131

Garden Cemetery - Phase 5 - City of Chelsea
New Construction, Infrastructure
Conception
$450,000 est. value
Chelsea, MA 02150

Harvard University Enterprise Research Campus
New Construction, Infrastructure - 61,500 SF
Design
$1,000,000,000 CJ est. value
Boston, MA 02134

Washington Street Mixed-Use Development
Addition, Demolition, New Construction, Renovation, Infrastructure - 26,626 SF
Design
$21,300,000 CJ est. value
Boston, MA 02130

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

24 Drydock Avenue / Boston
Demolition, New Construction, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Boston, MA 02210

Locker Room Renovations at Brighton High School - General Bids
Renovation
Results
$2,641,570 est. value
Boston, MA 02135

Adams School Facade and Roof Project - Sub
Renovation
Results
$261,600 CJ est. value
Boston, MA 02128

NEXUS at the Allston Innovation Corridor
New Construction, Infrastructure
Construction
$100,000,000 CJ est. value
Boston, MA 02134

515-519 E. 2nd Street Residential Development
New Construction, Infrastructure
Construction
$13,000,000 CJ est. value
Boston, MA 02127

Residences at Readville Station
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Boston, MA 02136

Soldiers Field Road Residential Development
New Construction, Infrastructure - 14,500 SF
Pending Verification
$198,000,000 CJ est. value
Boston, MA 02135

Steinert Hall Renovations
Renovation, Infrastructure
Conception
$6,000,000 CJ est. value
Boston, MA 02130

Neponset Wharf
New Construction, Infrastructure - 38,400 SF
Design
$90,000,000 CJ est. value
Boston, MA 02122

Duct Bank Relocation Acceleration, On Call, Boston and Cambridge
Infrastructure
Post-Bid
$7,820,033 CJ est. value
Boston, MA 02203

Last Updated 07/18/2023 12:14 PM
Project Title

Installation of Water Bottle Refill Stations - Package 7, Various Schools

Physical Address View project details and contacts
City, State (County) Boston, MA 02203   (Suffolk County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $825,000 [brand] Estimate
Plans Available from Agency's Affiliate - 06/19/23
Owner View project details and contacts
Architect View project details and contacts
Description

All plumbing bids must carry $215,000 for the electrical filed sub bids. A price adjustment will be made to match the actual electrical filed sub bid price that is selected after reopening. Demolition of existing drinking fountains or sinks for replacement with water bottle refill stations and the installation of water bottle refill stations at new locations without existing drinking water infrastructure. All units will be mounted on phenolic enclosures or panels. PROJECT LOCATIONS: 1. Lyon High School - 95 Beechcroft St., Brighton, MA 02135 2. Lyon K-8 - 50 Beechcroft St., Brighton, MA 02135 3. Blackstone Elementary - 380 Shawmut Ave., Boston, MA 02118 4. Dudley St. Neighborhood School - 6 Shirley St., Roxbury, MA 02119 5. Taylor Elementary - 1060 Morton St., Mattapan, MA 02126 6. Tech Boston Academy - 9 Peacevale Rd., Dorchester, MA 02124 7. Brighton High School - 25 Warren St., Brighton, MA 02135 8. Pauline Shaw Elementary - 429 Norfolk St., Dorchester, MA 02124 9. Tynan Elementary - 650 E. Fourth St., South Boston, MA 02127 10. Joseph Lee School - 155 Talbot Ave, Boston, MA 02124 For information specific to this particular IFB, please submit questions in writing to Audrey Ng, Water & Sustainability project manager at ang@bostonpublicschools.org The Work of Project is defined by the Contract Documents and consists of the following: 1. Demolition of existing water fountains. Covering demolition site with a panel if the unit will not be replaced. 2. Roughing of existing plumbing to serve new water bottle refill stations at new and existing locations. 3. All drains must be commercially snaked and tested to confirm water can flow for at least 20 minutes. 4. Running new circuits to serve water bottle refill stations where service was not previously existing. 5. Mounting of phenolic enclosures or panels. Specific dimensions to be confirmed onsite by contractor. 6. Installation of new water bottle refill stations Address questions to Audrey Ng, Water & Sustainability Project Manager, ang@bostonpublicschools.org

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents