Similar Projects
STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

STH 146 - STH 73 - Const Ops/ Bridge Reconstruction
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Poynette, WI 53955

Business Park Road Manufacturing Development / Wisconsin Dells
Addition, Demolition, Infrastructure - 9,600 SF
Design
$1,036,800 CJ est. value
Wisconsin Dells, WI 53965

Kwik Trip #808 Rebuild / Columbus
Demolition, New Construction, Infrastructure - 10,984 SF
Design
$2,000,000 CJ est. value
Columbus, WI 53925

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

2022/2023 Project Cycle of the Local Road Improvement Program
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Newport, WI 53965

2022 Crack Filling
Infrastructure
Results
Portage, WI

Madison - Portage, South County Line to STH 60; Madison - Portage, STH 60 Interchange, B-11-165 and 166
Infrastructure
Results
$1,000,000 to $1,999,999 est. value
Poynette, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

The View Porte Cochere and Cold Storage Ramp Addition
Addition, Demolition, Infrastructure
Pending Verification
$300,000 CJ est. value
Wisconsin Dells, WI 53965

Cardinal FG Maintenance Building
New Construction, Infrastructure - 1,920 SF
Pending Verification
$1,000,000 CJ est. value
Portage, WI 53901

Town of Scott, Inglehart Road - Construct Ops/ Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Cambria, WI 53923

Road Bid - Klappstein Road
Infrastructure
Post-Bid
$180,000 est. value
Portage, WI 53901

Reedsburg - Wisconsin Dells, Golf Course Road to Old 12
Infrastructure
Results
$250,000 to $499,999 est. value
Wisconsin Dells, WI 53965

Last Updated 10/04/2023 09:24 AM
Project Title

Marshall Memorial Hall Handicap Ramp Replacement

Physical Address View project details and contacts
City, State (County) Portage, WI 53901   (Columbia County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 25, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Site Directions: 30 Wisconsin Dells Parkway South Removal and Replacement of the Existing Ada Accessible Ramp Buildings Rehabilitation/Renovation, Buildings/Public, Fencing/Guardrails/Handrails, Construction, Sidewalks/Curbs/Gutters, Welding, Concrete/Formed/Flatwork/Foundation. The work will include removal and replacement of the existing ADA accessible ramp. The work includes safety/signage, removal, concrete sono tube and sidewalk work, framing, finishing, removal and restoration of existing metal rail including re-installation. Questions received after Thursday July 27, 2023 at 4:00 pm may not be answered.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents