Similar Projects
Smithbridge Rd. Corridor(L)
Infrastructure
Conception
$1,892,000 CJ est. value
Chadds Ford, PA 19317

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

Marshall Rd o/ Cobbs Creek
Infrastructure, Renovation
Design
$12,314,000 CJ est. value
Upper Darby, PA 19082

State Rd o/Darby Creek
Infrastructure, Renovation
Design
$9,294,250 CJ est. value
Media, PA 19063

Spring Mill Road (SR 0320 and SR 3030) and Montgomery Avenue Intersection Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Villanova, PA 19085

RFP Design - Comprehensive Plan Update and Parks Recreation and Open Space Plan Development and Shaffer Park Design
New Construction, Infrastructure
Bidding
$300,000 CJ est. value
Bethel Township, PA 19060

T-28 Construction and PS-5 Modifications
Renovation
Post-Bid
Chester, PA

Demolition and Site Restoration
Demolition, Infrastructure
Post-Bid
Darby, PA 19023

Site Projects at the Sharon Hill Campus
Results
Sharon Hill, PA 19079

District Administration Office & Transportation Facility Renovation - Site Construction
Infrastructure
Results
$2,700,000 est. value
Drexel Hill, Upper Darby, PA 19082

Villanova University - St Mary`s Hall Gymnasium Pool Infill
Construction
Villanova, PA 19085

Estates at Coventry Woods Phase 2A
New Construction, Infrastructure
Pending Verification
$19,000,000 CJ est. value
Springfield, PA 19064

Residences at Marple Preserve
New Construction, Infrastructure
Pending Verification
$78,000,000 CJ est. value
Broomall, PA 19008

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Folcroft Avenue O/AMTRAK
Demolition, Infrastructure
Design
$2,318,000 CJ est. value
Media, PA 19063

Last Updated 12/05/2022 05:40 AM
Project Title

Sod Farm Slurry Wall - 003363A - Pinellas County

Physical Address View project details and contacts
City, State (County) Elwyn, PA 19063   (Delaware County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sod Farm Slurry Wall #003363A Reconstruct sod farm slurry wall. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of December 05, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents