Similar Projects
SE 25th Avenue Resurfacing (from SE 110th Street to SE 95th Street)
Bidding
$375,000 est. value
FL

SE 100th St Resurface (SE 36th Avenue to US 301) and SE Campbell Road Resurface (US 301 to SE 59th Terrace Road/Oak Road)
Bidding
$484,000 est. value
Ocala, FL 34420

Asset Maintenance Marion County
Post-Bid
$17,701,000 est. value
FL

Silver Springs Acres Road Grading
Term Contract
Results
Less than $38,000 est. value
FL

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

CR 314A Rehabilitation (From SE 95th St Road to SE 24th Street Road)
Results
Less than $2,904,000 est. value
Ocala, FL 34471

2019 Marion Oaks Resurfacing Project
Results
Less than $1,400,000 est. value
Ocala, FL 34471

Milling and Resurfacing/Drainage Improvements/Lighting (BDI)
Results
Less than $1,248,418 est. value
FL

CR 484 Widening - From Marion Oaks Pass To Marion Oaks Course
Results
$7,162,697 est. value
Ocala, FL

Florida Crossroads Commerce Park Road (Southerly Terminus to CR 484)
Results
Less than $5,016,000 est. value
Ocala, FL 34471

Southwest 49th Court Road (0.7 Miles South of CR 484 to Marion Oaks Trail)
Results
Less than $4,688,933 est. value
Ocala, FL 34471

Transportation Rehabilitation Improvement Program
Results
Ocala, FL 34471

Asphalt Pavement Repair
Results
Less than $820,000 est. value
FL

2020 Silver Springs Shores Resurfacing Project
Results
Less than $1,050,000 est. value
FL

2020 Rainbow Park Units 1 and 2 Roadway Improvement Project
Results
Less than $280,000 est. value
FL

Last Updated 07/21/2020 12:40 PM
Project Title

Oak Road Resurfacing (2.2 Mile Loop off SE Maricamp Road)

Physical Address View project details and contacts
City, State (County) Ocala, FL 34471   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $735,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing of Oak Road from construction joint at edge of travel lane of SE Maricamp Rd at Lake Weir High School to a construction joint at edge of a travel lane of SE Maricamp Rd near the Quik King gas station. Work will include milling & resurfacing of existing pavement, constructing side street & driveway aprons, establishing sod, and restriping pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents