Similar Projects
HVAC Preventative Maintenance and Repair Services
Alteration
Bidding
Solana Beach, CA

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

OR Suite HVAC Replacement In Bldg 1, Project 664-21-302
Term Contract
Results
$2,000,000 to $5,000,000 est. value
San Diego, CA 92161

HVAC Maintenance Services
Term Contract
Results
Oceanside, CA

OR Suite HVAC Replace in Building I
Alteration
Post-Bid
San Diego, CA 92161

SDIA- Airport Administration Building - HVAC
Alteration
Results
San Diego, CA 92101

Heating, Ventilation, and Air Conditioning (HVAC) Duct System Maintenance Services (Oceanside DMV Field Office)
Term Contract, Alteration
Post-Bid
$15,000 est. value
Oceanside, CA 92056

HVAC Installation at Mendoza and Nicoloff Elementary
Alteration
Results
$645,000 est. value
San Diego, CA 92154

La Cima CC HVAC Replacements
Alteration
Post-Bid
Julian, CA 92036

New Cooling Tower
Alteration
Results
$200,000 est. value
Poway, CA 92064

Mission Valley HVAC Upgrade Project
Term Contract
Post-Bid
$1,496,000 est. value
CA

HVAC Air Handler Unit (ACU) Replacement Services
Term Contract
Post-Bid
Chula Vista, CA

HVAC Maintenance IWA
Alteration
Post-Bid
CA

Preventive Maintenance and As-Needed Repair Services for Ventilators
Alteration
Post-Bid
San Diego, CA

Reported 06/24/2022 12:00 AM
Project Title

Grossmont College Bard Retrofit Kit Replacement

Physical Address View project details and contacts
City, State (County) El Cajon, CA 92020   (San Diego County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Grossmont College has an ongoing heating, ventilation, and air conditioning (HVAC) assessment that has identified the existing small motor for the HVAC Bard(R) units will not meet the cubic feet per minute (CFM) and air changes per hours (ACH) requirements for pandemic operating conditions with MERV-13 Filters installed. The project will include the installation and replacement of the small motors with a Bard(R) (or equal) Motor Retrofit Kit for a total of thirty (30) existing HVAC Bard(R) units

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Operation and Maintenance of HVAC Systems, Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents