Similar Projects
Staybridge Suites / Sevierville
New Construction, Infrastructure
Conception
$24,200,000 CJ est. value
Sevierville, TN 37862

Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

North Edgehill Commons
New Construction, Infrastructure - 160,000 SF
Design
$361,000,000 CJ est. value
Nashville, TN 37203

MTRO Essential Maintenance
Renovation, Infrastructure
Design
$3,400,000 CJ est. value
Nashville, TN 37214

Site Preparation/Excavation
Post-Bid
Cleveland, TN 37311

Laurel Branch Park Site Preparation and Sewer Extension
Infrastructure
Post-Bid
Maryville, TN 37801

High Performance Lining at the Wastewater Treatment Plant
Results
Spring Hill, TN 37174

Fred Young Park Equestrian Center - Site Package
Results
Jackson, TN 38305

Whataburger - TN 109 / Lebanon
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Lebanon, TN 37090

Pinewood Townhomes
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Chattanooga, TN 37421

Hardin Valley Academy 32 Classroom Addition - Knox County
Addition, Demolition, Infrastructure
Conception
$10,972,000 CJ est. value
Knoxville, TN 37932

Storyville Gardens Phase 1
New Construction, Infrastructure
Design
$300,000,000 CJ est. value
Nashville, TN 37219

Henning Wastewater System Improvements
New Construction
Post-Bid
Henning, TN

McCroskey Island Wastewater Treatment Plant Improvements
New Construction
Results
$1,500,000 est. value
Sevierville, TN 37876

The Highlands Phases 8, 9 & 10
New Construction, Alteration
Pending Verification
$71,000,000 est. value
Columbia, TN 38401

Last Updated 02/06/2023 02:35 PM
Project Title

Pickwick Landing State Park WWTP Renovation

Physical Address View project details and contacts
City, State (County) Pickwick Dam, TN 38365   (Hardin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $2,930,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade or replace the existing wastewater treatment plant at Pickwick Landing State Park and all required related work. As of February 6, 2023, an engineer has been selected, but the stage of design is unknown. A timeline for bidding and construction has yet to be announced.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents