Similar Projects
River Trail Expansion - City of Grand Junction
Infrastructure
Conception
$1,700,000 CJ est. value
Grand Junction, CO 81501

Riverfront Trail Widening at Broadway and Colorado River (Parkland) - City of Grand Junction
Infrastructure
Conception
$400,000 CJ est. value
Grand Junction, CO 81501

The Junction Apartments / Old City Market Redevelopment
Demolition, New Construction, Infrastructure - 200,980 SF
Design
$60,000,000 CJ est. value
Grand Junction, CO 81501

Copper Creek Apartment Community
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Fruita, CO 81521

2022 Sewer Replacement - Unaweep Avenue Project
Infrastructure
Bidding
$2,860,164 CJ est. value
Grand Junction, CO 81503

WWTP Improvements & Asset Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Grand Junction, CO 81505

WD for Drilling Services at The Bonita Peak Mining District
Term Contract
Post-Bid
Silverton, CO 81433

FY 2022 Grading and Drainage Package
Infrastructure
Post-Bid
Grand Junction, CO

Vacant Property Redevelopment 230 South 5th Street
Infrastructure
Results
Grand Junction, CO 81501

Highline Lake State Park - Wastewater Plant Expansion
Infrastructure
Results
$1,400,000 est. value
Loma, CO 81524

Two Rivers Convention and Events Center Hotel
Addition, New Construction, Build-out, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Grand Junction, CO 81501

West Junction Metropolitan District / Centennial Commercial Park
New Construction, Infrastructure - 715,000 SF
Pending Verification
$100,000,000 CJ est. value
Grand Junction, CO 81501

Canyon View Pour in Place Playground Surfacing Replacement (Cannabis) - City of Grand Junction
Infrastructure
Conception
$300,000 CJ est. value
Grand Junction, CO 81505

24 and G Road Improvements Phase II Project
Infrastructure
Bidding
$300,000 CJ est. value
Grand Junction, CO 81505

Performing Arts Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$43,000,000 CJ est. value
Grand Junction, CO 81501

Last Updated 11/10/2022 07:02 PM
Project Title

Colorado River Pre-Sedimentation Facilities Project

Physical Address View project details and contacts
City, State (County) Grand Junction, CO 81501   (Mesa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $6,875,200 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Colorado River Pre-Sedimentation Facilities Project The project contemplated consists of the construction of two earthen pre-sedimentation ponds with concrete lining, 24-inch piping, concrete outlet structures, associated process and electrical equipment including connection to existing 24-inch discharge pipeline and other miscellaneous work as described in the Contract Documents. Plans, specifications and bid documents may be reviewed at the Ute Water Administration Office. A mandatory Statement of Interest is required via email to dpriske@utewater.org by 5:00 pm on Friday, August 19, 2022 . the selected Bidder will be notified no later than September 30, 2022 . If agreement terms can be arranged between the selected Bidder and Owner, all other Bidders will be notified no later than October 7, 2022 . A five percent (5%) Bid Bond will be required, as well as one hundred percent (100%) Performance and Payment Bonds to guarantee the faithful performance of the contract. It is required that the surety issuing such bonds have an attorney-in-fact or a principal doing business in Colorado. This information must be included on the bond statement. The Ute Water Conservancy District reserves the right to reject any and all bids, to postpone the award for thirty (30) days, to delete certain items from the Proposal, and to award the Contract to the lowest responsible bidder. The Ute Water Conservancy District may reject any bid not in compliance with all prescribed bidding procedures and requirements and, may reject any and all bids upon finding that it is in the District s best interest to do so. Contractor shall be licensed as required by the State of Colorado and local governments or municipalities. ENGINEER ESTIMATE: $10,000,000.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents