Similar Projects
The Adirondack / Glens Falls T
Conception
Chester, NY

Highway repair where and when NYSDOT Region 8
Infrastructure
Bidding
$3,100,000 est. value

Sealcoating and Striping
Infrastructure
Bidding
Walden, NY 12586

Providing Hot Mix Asphalt
Post-Bid
Goshen, NY 10924

Traffic Signal Replacement - Intersection of Kingston Avenue and Hamilton Street
Post-Bid
Port Jervis, NY 12771

Pavement Improvements/Repairs
Results
$25,000 to $100,000 est. value
Newburgh, NY

Cold Milling for the Year 2020
Results
Newburgh, NY 12550

Paving
Post-Bid
Central Valley, NY 10917

Asphalt Repair and Replacement
Results
Goshen, NY 10924

Asphalt Paving
Post-Bid

Paving Project - Shepard Parking Lots 7A and 7B
Results
Middletown, NY 10940

2020 Village Paving Project Including Grove Street
Post-Bid
Walden, NY 12586

Highway Job Order Contract
Results

Bike Route and Pedestrian Trail PIN 8760.02
Post-Bid
Warwick, NY

Kings Elementary/Maintenance Building/Transportation Parking Lot Paving
Results
Warwick, NY 10990

Reported 09/01/2021 12:00 AM
Project Title

Middletown Traffic Operations Stage I and II, Downtown Revitalization Initiative: Streetscapes Improvements, Supplemental Streetscapes Improvements

Physical Address View project details and contacts
City, State (County) Middletown, NY   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 07/13/21
Owner View project details and contacts
Architect View project details and contacts
Description

The projects are located within the City of Middletown, NY. The corridors for PIN 8757.07 & 8760.98 are Dolson Avenue, Fulton Street, West Main Street, East Main Street, Wickham Avenue, Wisner Avenue as well as intersections along Monhagen Avenue, Lake Avenue and North Street. Stage I (PIN 8757.07) will include the upgrade of 18 intersections on County Route 67 (West and East Main Street) and Route 17M (Dolson Avenue, Fulton Avenue & Monhagen Avenue) as well as two non-signalized intersections within the City of Middletown. Stage II (PIN8760.98) will include the upgrade of 9 intersections on Route 17M & Route 211 (West Main Street, Wickham Ave, North Street).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents