Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Bid Package #2 - Additions and Renovations to Bibich Elementary - Building Package
Addition, Demolition, Renovation, Infrastructure
Design
$9,434,204 CJ est. value
Dyer, IN 46311

Bid Package #3 - Additions and Renovations to Bibich Elementary - Mechanical/Electrical Package
Addition, Demolition, Renovation, Infrastructure
Design
$3,238,550 CJ est. value
Dyer, IN 46311

Small Structure Pipe Lining
Infrastructure
Bidding
$1,386,823 CJ est. value
Indianapolis, IN 46208

Small Structure Pipe Lining
Infrastructure
Bidding
$1,386,823 CJ est. value
Indianapolis, IN 46208

Signing
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Bedford, IN 47421

IN000A IUPUI Campus-Repair Tunnel Top Under Ball Gardens
Post-Bid
Indianapolis, IN 46202

2021 Roadway and Water Main Improvements - Crestwood, Bluebird, Elliott, Timrick
Post-Bid
Munster, IN 46321

5400 Carroll Road Water Main Extension
Results
Lawrence, IN 46226

Abandoned Coal Mine Restoration
Results
$150,000 est. value

Centerpoint BioFuels Plant
New Construction, Infrastructure
Pending Verification
$600,000,000 CJ est. value
Gary, IN 46406

RFQ Design - Co-location Campus Accommodating Both Schools
New Construction, Infrastructure
Pending Verification
$375,000,000 CJ est. value
Indianapolis, IN 46204

Sewer Improvements - County of Lake
Infrastructure
Conception
$25,000,000 est. value
Crown Point, IN

Liberty Park Pipe Lining, Crown Point
Infrastructure
Design
$5,000,000 CJ est. value
Crown Point, IN 46307

Last Updated 08/18/2022 01:35 PM
Project Title

I-69 Water and Sanitary Sewer Extension Project at SR 44

Physical Address View project details and contacts
City, State (County) Martinsville, IN 46151   (Morgan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes installation of approximately 1,350 LF of 8-inch gravity sanitary sewer and 1,350 LF of 12-inch water main. Work also includes two trenchless, horizontal directional drilled (HDD) crossings of I-69. Crossings consist of 20-inch and 16-inch HPDE casings to accommodate a 12-inch water main carrier pipe and 6-inch force main carrier pipe respectively. A Pre-Bid Meeting will not be held for this project. All prime contractors, subcontractors, small, minority, disadvantaged and/or women business enterprises and other interested parties are invited and encouraged to submit a Bid. Contractors and subcontractors performing public works with a value of $300,000 or greater must be certified by the Indiana Department of Administration (IDOA) in accordance with IC 4-13.6-4. Before commencing Work, the Bidder to whom the Work is awarded will be required to furnish Performance and Payment Bonds in an amount equal to the Contract Price, and certificates of insurance as required in the Specifications. All Bonds and liability insurance shall remain in effect for a period of twelve (12) months following completion and OWNER acceptance of construction. Failure to execute a Contract and to furnish Bonds, certificates of insurance, and IDOA certification, as hereinafter set out will be cause for forfeiture to the OWNER of the amount of money represented by the certified check or Bidder's Bond, as and for liquidated damages. A conditional or qualified Bid will not be accepted. No Bid may be withdrawn after the scheduled closing time for receipt of Bids for at least 60 days to allow review of Bids before announcing award of Contract. Bidders shall be required to meet all applicable State requirements including but not limited to those in IC 4-13-18, 4-13.6-4, 5-16-13, 22-5-1.7 and 36-1-12. The OWNER reserves the right to reject any or all Bids, or to make such combination of Bids as may seem desirable, and to waive any and all informalities in the bidding. The OWNER may award Bids based upon selection of any combination of Proposal Form line items as well as mandatory alternatives. Bids shall be awarded to the Bidder or Bidders deemed to be the lowest, responsible, and responsive by the OWNER.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents