Similar Projects
Stormwater Drainage Assistance Program – 904 Wakestone Court
Bidding
Raleigh, NC

Action Park Retaining Wall
Post-Bid
Fuquay-Varina, NC 27526

Raleigh Green Stormwater Infrastructure Retrofits
Post-Bid
Less than $600,000 est. value
Raleigh, NC 27602

Dorothea Drive Drainage Improvements (Formal)
Results
Raleigh, NC

Bass Lake Stream Channel Improvements
Results
Less than $836,800 est. value
Holly Springs, NC

Bay Leaf Station 3 - Site Drainage Improvements
Post-Bid
Raleigh, NC 27612

New Hope Church Road Improvements and Green Road Sidewalk
Results
Raleigh, NC

Stormwater Drainage Assistance - Chapel Hill Road Drainage Improvements
Post-Bid
Less than $317,000 est. value
Raleigh, NC 27607

Foundation Repairs for the Archives and History Building
Results
Raleigh, NC 27601

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

Bayoak Drive at Joel Court Storm Drainage Improvement Project
Results
Less than $374,677 est. value
Cary, NC

Fairview Avenue and Green Drive Culvert Replacement Project
Post-Bid
Morrisville, NC

Rose Garden Stormwater Improvement
Results
Raleigh, NC 27601

Stormwater Drainage Assistance Program - Bundle Project 3
Post-Bid
Less than $381,000 est. value
Raleigh, NC 27612

Brunswick Town/Fort Anderson State Historic Site Shoreline Stabilization - Phase III
Results
Less than $1,424,000 est. value
Raleigh, NC

Reported 10/23/2020 12:00 AM
Project Title

Streambank Repairs (Formal)

Physical Address View project details and contacts
City, State (County) Raleigh, NC   (Wake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the installation of streambank stabilization as described in the specifications and shown on the drawings for the following project areas: Project Area 2: Crabtree Creek Trail east of Wake Forest Road at MM 8 Project Area 3: Crabtree Creek Trail at 3637 Alleghany Drive east of Glenwood Avenue at MM 11 1/4. Project Area 4: Neuse River Trail Mile Marker 8 1/8. Connector trail to Horseshoe Farm Nature Preserve

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents