Similar Projects
RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Elmore County Prison - State of Alabama
New Construction, Infrastructure
Post-Bid
$623,000,000 CJ est. value
Tallassee, AL 36078

Downtown Utility Relocation
Infrastructure
Results
est. value
Tallassee, AL

Fields at 17 Springs - Water and Sewer Project
Infrastructure
Results
Millbrook, AL

Diamond Oaks - Phase 2: Sewer Manhole Rehabilitation Project
Infrastructure
Construction
$910,405 CJ est. value
Millbrook, AL 36054

Diamond Oaks - Phase 2: Sewer Manhole Rehabilitation Project
Infrastructure
Construction
$910,405 CJ est. value
Millbrook, AL 36054

Miscellaneous Renovations at the Thomasville Campus for the I.S.T.C. For Jf Ingram State Technical College
Renovation, Infrastructure
Post-Bid
$190,000 CJ est. value
Deatsville, AL 36022

Drainage Improvements for Panther Palace Park
Infrastructure
Results
$68,269 CJ est. value
Eclectic, AL 36024

Site Demolition, Erosion Control, Clearing and Grubbing, Grading and Excavation, Parking Lot Construction
Infrastructure
Post-Bid
$160,000 CJ est. value
Wetumpka, AL 36092

Wetumpka Water Works and Sewer Board Master Meter Replacement at Old Montgomery Highway
Infrastructure
Results
$173,000 CJ est. value
Wetumpka, AL 36092

CVS #4943 / Tallassee
Infrastructure - 33,500 SF
Post-Bid
$400,000 CJ est. value
Tallassee, AL 36078

Contract No. 2 Lagoon Upgrades
Build-out, Infrastructure
Post-Bid
$3,695,000 CJ est. value
Tallassee, AL 36078

Publix and Shops - The Shoppes at Fort Toulouse / Wetumpka
New Construction, Infrastructure - 55,491 SF
Post-Bid
$20,120,000 CJ est. value
Wetumpka, AL 36092

Jack's / Eclectic - Rebid
New Construction, Infrastructure - 3,275 SF
Post-Bid
$1,200,000 CJ est. value
Eclectic, AL 36024

Jack's Eclectic
New Construction, Infrastructure
Post-Bid
Eclectic, AL 36024

Last Updated 03/24/2023 09:37 AM
Project Title

Site Work / Enabling Works Sanitary Sewer Service Package for the New Men's Correctional Facility

Physical Address View project details and contacts
City, State (County) Elmore, AL 36025   (Elmore County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Work / Enabling Works Sanitary Sewer Service Package for the New Men's Correctional Facility for the Alabama Department of Corrections Elmore County, Alabama (State Funds) Gmc Project No. CMGM21-0151(4) the Work of the Project Includes, but is Not Limited to, a Sanitary Sewer Concrete Lift Station and Vault, Dual Mechanical Screen Assembly With Concrete Channels, Electrical Building, Electrical, Standby Generator and Related Appurtenances; as Specified and as Indicated on the Drawings; Coordination and Supervision of the Entire Project; and All Related Work, as Indicated in the Bid and Contract Documents. A Cashier's Check or Bid Bond Payable to Alabama Department of Corrections in an Amount Not Less Than Five (5) Percent of the Amount of the Bid, but in No Event More Than $10,000, Must Accompany the Bidder's Proposal. Performance and Statutory Labor and Material Payment Bonds, Insurance in Compliance With Requirements, and Verification of E-verify Enrollment (Also With Proposals), Will Be Required at the Signing of the Contract. Other Sets for General Contractors, and Sets for Subcontractors and Dealers, May Be Obtained With the Same Deposit, Which Will Be Refunded as Above, Less Cost of Printing, Reproduction, Handling and Distribution, Which is Estimated to Be the Same as the Deposit Amount. Bids Must Be Submitted on Proposal Forms Furnished by the Engineer or Copies Thereof. All Bidders Bidding in Amounts Exceeding That Established by the State Licensing Board for General Contractors Must Be Licensed Under the Provision of Title 34, Chapter 8, Code of Alabama, 1975, as Amended, and Must Show Such Evidence of License Before Bidding or Bid Will Not Be Received or Considered by Engineer or Owner; the Bidder Shall Show Such Evidence by Clearly Displaying Their Current License Number on the Outside of the Sealed Envelope in Which the Proposal is Delivered; Bidder Must Also Include Their Current License Number on the Proposal Form. This Project is Being Bid Excluding Taxes, and Requires the Contractor Comply With the Requirements of Act 2013-205, Which Was Signed Into Law on May 9, 2013. The Contractor and the Owner Will Be Required to Apply for Certificates of Exemption With the Alabama Department of Revenue Which Will Handle Administration of the Certificates. The Contractor Shall Account for the Tax Savings on the Proposal Form. Additional Qualifications and Requirements for General Contractor Bidders and Separate Subcontractors and Manufacturers Are Indicated in the Bid and Contract Documents. Alabama Department of Corrections Engineering Division Elmore, Alabama John Q. Hamm, Commissioner Goodwyn Mills Cawood, Llc Members, American Institute of Architects 2660 Eastchase Lane, Suite 200 Montgomery, Alabama 36117 Phone: (334) 271-3200 Fax: (334) 272-1566 Contractors Are Encouraged to Use the Digital Plans. Refunds Will Be Issued for Printed Sets Only Issued by the Engineer to Each General Contract Bidder on the First Two (2) Sets Issued Submitting a Bonafide Bid, Upon Return of Documents in Good and Reusable Condition Within Ten (10) Days of Bid Date. The Owner Reserves the Right to Reject Any or All Proposals and to Waive Technical Errors if, in the Owner's Judgment, the Best Interests of the Owner Will Thereby Be Promoted. No Bid May Be Withdrawn After the Scheduled Closing Time for Receipt of Bids for a Period of Sixty (60) Days.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents