Similar Projects
Design-Bid-Build: Potable Water Distribution System
Infrastructure
Design
$10,000,000 to $25,000,000 est. value
Indian Head, MD 20640

Water Line Replacement, Service Connection, and Looping Project
Infrastructure
Bidding
Manchester, MD

Madison Street Area - 30-Inch Water Main Rehabilitation
Infrastructure
Bidding
$4,000,000 to $5,000,000 est. value
Baltimore, MD 21202

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

Granular Activated Carbon Filtration System Installation and Maintenance
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value

US 40 6" Sewer Force Main Replacement
Results
Aberdeen, MD

Water Main Replacement Project
Results
Denton, MD 21629

Route 36 Water Pressure Reducing Valve Replacement
Infrastructure
Bidding
Cumberland, MD

Valve and Fire Hydrant Assessment Operation and Maintenance
Term Contract
Post-Bid
$8,000,000 est. value
Baltimore, MD 21270

Deal Island Road Watermain Loop Project
Results
Princess Anne, MD 21853

Galvanized Pipe Replacement (RGH)
Post-Bid
Laurel, MD 20707

Heather Hills Water Main Rehabilitation
Results
Bowie, MD 20715

Water Line Installation Fraternity Row
Infrastructure
Post-Bid
$100,000 to $500,000 est. value
College Park, MD 20740

Pipe Reinsulation, Drywall Repairs, and Replacing Ceiling Tiles
Results
Less than $100,000 est. value
Catonsville, MD 21228

Mountainview Road Extension and SWM Project
Alteration
Post-Bid
Boonsboro, MD 21713

Last Updated 03/24/2022 08:17 AM
Project Title

Park Water Treatment Plant Raw Water Main Improvement

Physical Address View project details and contacts
City, State (County) Salisbury, MD   (Wicomico County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to install a new flow meter and initiate replacement of the raw water mains located in the City Park connecting the wells to the Park Water Treatment Plant. While the complete design extends east to Well 16 A and south to Well 8A as shown the full drawing set, the current scope is to begin construction at STA 0+00 and construct approximately 220 feet of new construction and tie back into the existing 24” raw water main as shown on the Attachment 4: Phase I – Re-alignment. Phase I includes installation of 24”, and 16” water main totaling approximately 220 linear feet as well as installation of a meter vault, flow meter, control wiring, dry well, and appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents