Similar Projects
Reported | 12/22/2018 12:00 AM |
Project Title | Design/Build Project |
Physical Address | View project details and contacts |
City, State (County) | Baldwin, MI (Lake County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines, Sanitary Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design/Build project to design, furnish and install approxi- mately 8411 LF of 12" diameter C-900 water main primarily along Lincoln Street between Aulerich Road and Janet Street. There is also approximately 1550 LF of new sanitary sewer force main installation required along Lincoln Street to Auler- ich Road. Finally a natural gas main extension shall be in- stalled to the newly proposed Consumers Energy Building with a voluntary alternate to continue along Lincoln Street to Kunze Road. Included will be all piping, service connections, hydrants, valving, lift station, etc., per the plans and specifications prepared by the Design/Build team. | ||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |