Similar Projects
World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

World-Wide Water Storage Tank Remediation
Term Contract
Post-Bid

Dogwood Reservoir Rehabilitation
Results
Less than $388,198 est. value
Dayton, OH 45390

Bowling Green WPC ATAD Tank Cover Replacement
Results
Less than $750,000 est. value
Bowling Green, OH 43402

Multistack Preventative Maintenance
Term Contract
Post-Bid
Columbus, OH 43207

Luckey Area Water Tower Aeration and Mixing Improvements Wl 183L (A)(1)
Results
Less than $100,000 est. value
Bowling Green, OH 43402

Replace Hydrant Fuel System at Wright-Patterson Air Force Base
Post-Bid
$10,000,000 to $25,000,000 est. value
Wright Patterson Air Force Base, OH 45433

Substation Road Water Storage Tank Rehabilitation Project
Results
Less than $530,000 est. value
Medina, OH 44256

Clay Street Water Storage Tank Replacement
Post-Bid
South Zanesville, OH 43701

Mount Pleasant Water Storage Tank Recoating
Results
Less than $254,000 est. value
Mount Pleasant, OH 43939

API 653 External Tank Inspection
Post-Bid

Water Tower Maintenance Program
Results
$1,565,000 est. value
Pataskala, OH 43062

Northridge Water Tank Project
Post-Bid
Springfield, OH

Grafton Elevated Tank Rehabilitation
Results
$318,000 est. value
Grafton, OH

Water Tower Rehabilitation (2) 100,000 Gallon Double Elipse Tanks Miscellaneous Repairs
Post-Bid
Less than $100,000 est. value
Edgerton, OH 43517

Last Updated 07/27/2021 01:52 PM
Project Title

Elevated Storage Tank Improvements

Physical Address View project details and contacts
City, State (County) Archbold, OH   (Fulton County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves constructing complete, a 200,000-gallon single pedestal type elevated storage tank and related site improvements including grading, drainage, connecting piping, electrical, and telemetry. Other work, at Owner`s option, may include installing a re-chlorination system, cathodic protection, and a tank mixing and TTHM removal system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents