Similar Projects
Clarendon County Phase 3A - Wyboo Point to Eagle Pointe Water Main and Phase 3B - Patriot Road Well
Post-Bid
SC

Edgefield Highway Waterline Relocation
Post-Bid
Aiken, SC

Phase I Replacement of Approximately 2,500 Linear Feet of 18 Inch Wastewater Line
Results
$1,100,000 est. value
Bishopville, SC 29010

College Street Waterline Upgrades
Results
Due West, SC

Water Pipeline Pigging Project
Post-Bid
Mount Pleasant, SC

2017 System Wide Small Waterline Improvements Project
Results
Williamston, SC

Utility Relocations
Post-Bid
Batesburg-Leesville, SC

Oswego Rural Water Company Water System Expansion - South of Congruity
Results
$1,000,000 to $1,200,000 est. value
Cheraw, SC

Phase III Enoree Water and Sewer Improvements
Post-Bid
$250,000 to $300,000 est. value
Spartanburg, SC

Phase II I and I Reduction Project - Wastewater Collection System I and I Rehabilitation
Results
Sullivan's Island, SC

Water System Improvements - Lafrance Mill Village (West)
Post-Bid
Pendleton, SC

Aldrich Road Waterline Installation Project
Results
Spartanburg, SC 29301

Utility Extension
Post-Bid
Seneca, SC

2016 R D Project
Results
Belton, SC

2019 Water and Sewer Rehabilitation Project
Post-Bid
$100,000 to $140,000 est. value
Clemson, SC

Last Updated 12/06/2018 08:18 AM
Project Title

Force Main Replacement at Pump Station 112

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The project includes approximately 1,573 LF of new 6" PVC force main including a jack and bore under Dukes Street, removal and replacement of one joint each from 2 storm drains, repair of 2 gravel driveways and connections to existing force mains at Pump Station 112 and Metts Street. A bid alternate can be provided for a directional bore under the 2 storm drains in lieu of open cut construction with removal and replacement of the storm drains.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents