Similar Projects
Barack and Michelle Obama Elementary - Saint Paul Public Schools
Renovation, Addition
Conception
$10,000,000 est. value
Saint Paul, MN 55126

Resurfacing, Bridge Repair, Cable Median Barrier Installation
Infrastructure
Conception
$10,000,000 CJ est. value
Cologne, MN 55322

Vermillion Acres Senior Housing
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Hastings, MN 55033

Ninth Elementary Addition
New Construction
Design
$28,900,000 est. value
Lakeville, MN 55044

Kellys Sample Pool Project
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Anoka, MN 55303

Hamilton Elementary School HVAC Replacement and Deferred Maintenance - Phase 3
Renovation
Bidding
$974,400 CJ est. value
Coon Rapids, MN 55433

Lake Park Audubon Elementary School Additions and Renovations - Bid Package 2 - Re-bid
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$1,100,000 CJ est. value
Audubon, MN 56511

Lake Park Audubon Elementary School Additions and Renovations - Bid Package 2 - Re-bid
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$1,100,000 CJ est. value
Audubon, MN 56511

Blanket Flower SNA Gravel Pit Reclamation
Post-Bid
MN

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Regional Drinking Water Project Contract A - Wells 7 and 8 Construction
Renovation - 156,816 SF
Results
Cloquet, MN 55720

Moorhead Public High School
Renovation
Results
$100,000,000 est. value
Moorhead, MN 56560

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Cliff Road Multi-Residential
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Eagan, MN 55122

Last Updated 09/07/2022 11:32 AM
Project Title

Rockford Schools Site Improvements

Physical Address View project details and contacts
City, State (County) Rockford, MN 55373   (Wright County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a single prime work scope for all the work necessary for the interior site improvements and parking lot additions at 3 different sites - the Rockford Elementary, High School and Middle School. At the Middle School, the work will include but is not limited to the addition of a new bus loop/parking lot off Walnut Street, sidewalks, and striping. At the Elementary school, the work will include but is not limited to the addition of a new bus loop/parking lot off an internal circulation road, sidewalks, and striping. At the High School, the work will include but is not limited to the reclamation and repaving 3 different sections of the parking lot as alternates. Work will begin after receipt of the signed contract from the Owner. The anticipated award date is June 6, 2022. Pre-construction and submittals work related to the project is to commence immediately after receipt of the signed contract. The onsite work will begin on the premises no later than June 10, 2022. Owner requires all work related to the Middle School Bus Loop to be substantially complete on or before September 7, 2022, all work related to the Elementary School Bus Loop to be substantially complete on or before September 28. Final Completion of all work must be completed by October 31, 2022. For General Information/Bidders List, please contact Raeann Wynn via email at raeann.wynn@ics-builds.com or 612-999-1566.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents