Similar Projects
Rock Island Silicon Plant Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Conception
$20,000,000 CJ est. value
Rock Island, WA 98850

New Fire Station - Beebe Fire Station
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Orondo, WA 98843

US 97A/Knapps Hill Tunnel - Illumination Upgrades
Infrastructure
Design
$2,071,000 CJ est. value
Touhey, WA 98830

Dollar General #24148 / Bridgeport - Revised
New Construction, Infrastructure - 12,480 SF
Post-Bid
$1,500,000 CJ est. value
Bridgeport, WA 98813

Chief Joseph Dam Station Service Refurbishment - Turbines & Generators
Renovation
Post-Bid
$10,000,000 to $25,000,000 est. value
Bridgeport, WA 98813

Pangborn Memorial Airport MALSR Approach Lighting System
Infrastructure
Results
$2,909,713 CJ est. value
East Wenatchee, WA 98802

3rd Street SE and Rock Island Road Intersection Improvements
Infrastructure
Results
$1,177,204 CJ est. value
East Wenatchee, WA 98802

Generator Rewinds Chief Joseph Dam
Infrastructure
Construction
$70,748,065 CJ est. value
Bridgeport, WA 98813

Generator Rewinds Chief Joseph Dam
Infrastructure
Construction
$70,748,065 CJ est. value
Bridgeport, WA 98813

Chapacka East Subdivision
New Construction, Infrastructure
Pending Verification
$20,800,000 CJ est. value
East Wenatchee, WA 98802

Northern Fruit Campus
New Construction, Infrastructure
Pending Verification
$201,300,000 CJ est. value
East Wenatchee, WA 98802

US 97 / N of Orondo - Unstable Slopes
Infrastructure
Design
$1,854,000 CJ est. value
East Wenatchee, WA 98802

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Transmission and Distribution Dock Crew
Infrastructure
Results
$2,469,992 CJ est. value
East Wenatchee, WA 98802

Construction of Douglas County Fire District 4 Station 244 - Re-bid
New Construction, Infrastructure
Construction
$1,797,000 CJ est. value
Orondo, WA 98843

Last Updated 06/06/2023 04:33 AM
Project Title

Chief Joseph Dam Debris Boom Replacement

Physical Address View project details and contacts
City, State (County) Bridgeport, WA 98813   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,474,700 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Jun 05, 2023 Contract Award Number: W912DW23C0015 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: CMREM8DLBMC7 Contractor Awarded Name: KRCI LLC Contractor Awarded Address: East Wenatchee, WA 98802 USA Base and All Options Value (Total Contract Value): $2,474,700.41 Update the Liquidated Damages to $1,865.00 Furnish all labor, materials, and equipment to perform all w ork for the Chief Joseph Dam Debris Boom Replacement in accordance with the attached contract provisions, clauses, and technical specifications. Before signing and submitting this offer, please carefully review the instructions to offerors and bid submittal requirements. Failure to comply with the requirements of this solicitation and amendments, if any, may cause your offer to be rejected The magnitude of construction is estimated to be between $1 million and $5 million. No response will be posted to inquiries after the Close of Business on the third business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in ProjNet prior to bid submission. Nothing in this solicitation is changed unless an amendment is issued. Bid open: Join by video system Dial 27615883980@usace1.webex.com You can also dial 207.182.190.20 and enter your meeting number. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents