Similar Projects
Bay Mills Casino and Resort Expansion
Addition, Demolition, Infrastructure
Design
$65,000,000 CJ est. value
Brimley, MI 49715

Carbide Dock Project
Infrastructure
Bidding
$100,000 CJ est. value
Sault Sainte Marie, MI 49783

Demolition and Disposal ofExisting Rooms, and Remodel ofTwo (2) Cisler Center Guest Rooms, with Option of Splitting the Existing Two (2) Rooms into Three (3) Guest Rooms
Demolition, Build-out, Infrastructure
Post-Bid
$24,688 CJ est. value
Sault Sainte Marie, MI 49783

Norris Bell Tower, and The Purchase & Installation of two (2)35 foot Flag Poles
Infrastructure
Post-Bid
$22,000 CJ est. value
Sault Sainte Marie, MI 49783

Foundation Drainage Upgrades
Infrastructure
Results
$200,000 est. value
Sault Sainte Marie, MI 49783

Hot Mix Asphalt Resurfacing, Drainage and Pavement Markings
Infrastructure
Results
$709,000 est. value
Paradise, MI 49768

New Lock at the Soo, New Third Lock
Demolition, New Construction, Infrastructure
Construction
$1,300,000,000 CJ est. value
Sault Sainte Marie, MI 49783

St. Mary's River Soo Locks (Major Rehabilitation) - US Army Corps of Engineers
Infrastructure
Pending Verification
$37,300,000 CJ est. value
Sault Sainte Marie, MI 49783

Chippewa County International Airport - Rehabilitate Taxiway A
Infrastructure
Pending Verification
$1,054,039 CJ est. value
Kinross Charter Township, MI 49788

Residential Housing Site Improvements Phase IV
Infrastructure, Renovation
Post-Bid
$1,500,000 CJ est. value
Sault Sainte Marie, MI 49783

Chippewa Cty Manufacturing Building and Rail Spur EXP Kincheloe MI - All Trades
New Construction, Infrastructure - 20,000 SF
Results
$6,146,000 CJ est. value
Kinross Charter Township, MI 49788

RFP D/B - Design & Build a New Garage at Center for Freshwater Research & Education (CFRE)
New Construction, Infrastructure - 1,500 SF
Post-Bid
$80,000 CJ est. value
Sault Sainte Marie, MI 49783

Hot Mix Asphalt Reconstruction, Concrete Sidewalk and Ramps, Sanitary and Storm Sewer, Watermain and Pavement Markings on Meridian Street
Infrastructure
Results
$4,726,306 CJ est. value
Sault Sainte Marie, MI 49783

Playground Rehabilitation Projects for 2 Playgrounds (Sault Ste Marie Housing Site and Odenaang Housing Site)
Infrastructure
Post-Bid
$300,000 CJ est. value
Sault Sainte Marie, MI 49783

Veterans Park Pavilion
New Construction, Infrastructure - 4,000 SF
Results
$425,000 CJ est. value
De Tour Village, MI 49725

Last Updated 07/07/2023 01:37 AM
Project Title

20th Street Culvert Replacement

Physical Address View project details and contacts
City, State (County) Sault Sainte Marie, MI 49783   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $168,930 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All rights and remedies on this Payment Bond are solely for the protection of all claimants supplying labor and materials to the Contractor Performance and Payment Bonds - A performance bond and a payment bond are required for all contracts over $50,000.00 Question Deadline 04/11/2023 at 5:00 p.m. Local Time If the Owner has secured or will secure any permits, approvals and licenses and has paid or will pay any associated charges and fees, any such permits, approvals and licenses are itemized in this paragraph: EGLE Permit

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents