Similar Projects
Utility Analysis Zone 123
Results
Less than $20,340,061 est. value
Lauderdale Lakes, FL

Tract 27 Booster Station Upgrades Project
Results
Less than $1,755,000 est. value
Tamarac, FL 33321

Lift Station Improvement Project
Results
Wilton Manors, FL 33305

Replacement of Lift Station - 15
New Construction
Post-Bid
Pembroke Park, FL 33023

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

SW 130th Avenue Force Main and Lift Station 309 Improvements
Results
Davie, FL 33024

Sewage Lift Station Rehabilitation At Station Ft. Lauderdale
Renovation
Bidding
Dania Beach, Fort Lauderdale, FL 33004

B-22 Pumping Station Replacement
Results
Fort Lauderdale, FL 33301

Pump Station A-7 Upgrade P12415
Results
$1,300,000 est. value
Fort Lauderdale, FL 33301

Irrigation Pump Station Replacement at Pine Trails Park
Results
Parkland, FL 33067

Lift Station #8 Replacement
Results
Less than $1,758,348 est. value
Hallandale, FL 33009

Design-Build Pump Station B-4 Force Main P12567
New Construction
Results
Fort Lauderdale, FL 33301

Rehabilitation of Lift Stations 14A, 15C, 17B, 19C, and 20CA
Results
Coral Springs, FL

Lift Station Replacement- Lift Station No. 71
Results
$223,176 to $642,640 est. value
Plantation, FL 33317

Wastewater Lift Station 25
New Construction
Results
Less than $412,000 est. value
Deerfield Beach, FL 33441

Last Updated 05/27/2021 09:22 AM
Project Title

Sewer Lift Station Rehabilitation and Repair

Physical Address View project details and contacts
City, State (County) FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

30% CBE Goals Provide sewer lift station rehabilitation and repair services and appurtenances for Water and Wastewater Services and various other County agencies in need of these services. Work to be performed shall include all labor, materials. equipment, tools and incidentals to perform all tasks associated with the rehabilitation and/or repair of a sewer lift station. Services include but are not limited to, bypass pumping, wet well repair and restoration, replacement of top slabs, hatches, pumps, pipes, valves, control panels, electrical services, connection panels, underground vaults, excavating and backfilling, and disposing of surplus material and restoration

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents