Similar Projects
Walnut Park Playground Replacement - City of Brentwood
New Construction
Conception
$357,440 est. value
Brentwood, CA 94513

Homecoming Park Playground Replacement - City of Brentwood
Infrastructure
Conception
$264,740 est. value
Brentwood, CA 94513

Primrose Preschool
New Construction - 20,986 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Walnut Creek, CA 94598

Sunset Park Playground Replacement - City of Brentwood
New Construction
Design
$309,000 est. value
Brentwood, CA 94513

First Street Rain Garden
Infrastructure
Bidding
$450,000 est. value
Lafayette, CA 94549

Mayhew Way and Cherry Lane Trail Crossing Enhancement Project
Infrastructure
Bidding
$258,000 est. value
Walnut Creek, CA 94596

CHP Contra Costa Area Office Parking Lot Repair Services
Infrastructure
Post-Bid
Martinez, CA 94553

West County Mandarin School Play Structure
New Construction, Alteration
Post-Bid
Richmond, CA

Parking Lot Repairs and Seal and Stripe Services at the Concord Department of Motor Vehicles Field Office
Term Contract
Results
Concord, CA 94520

CDBG ADA Curb Ramp Installation Project
Infrastructure
Results
$175,000 est. value
Pittsburg, CA 94565

Traditions at the Meadow Subdivision
New Construction - 7,500 SF
Pending Verification
$1,000,000 est. value
Martinez, CA 94553

Oak Meadow Park Playground Replacement - City of Brentwood
New Construction
Conception
$346,682 est. value
Brentwood, CA 94513

Montego Senior Living
Renovation, Addition, Infrastructure - 21,710 SF
Design
$5,800,000 est. value
Walnut Creek, CA 94598

Alves Lane Trail Crossing Improvements
Infrastructure
Bidding
$198,000 est. value
Bay Point, CA 94565

Tara Hills Full Trash Capture
Infrastructure
Post-Bid
$2,050,000 est. value
Martinez, CA

Reported 07/12/2022 10:22 AM
Project Title

Sand Creek Sports Complex - City of Brentwood

Physical Address View project details and contacts
City, State (County) Brentwood, CA   (Contra Costa County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Misc. Recreational, Park/Playground, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value $12,832,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work, paving and renovation of a mixed-use development in Brentwood, California. Design plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot. This project is included in the City's Strategic Plan for FY 2022/23 - FY 2023/24. Sand Creek Sports Complex Phase I consists of the design and construction of the 14.50 acres of City owned property identified as the future Sand Creek Sports Complex. It is anticipated that the park will include up to 2-3 full size sports fields (soccer/ multi-use to be determined), parking lot, restrooms, picnic area and other possible park amenities like pickle ball courts, basketball courts, exercise equipment, playground etc. Phase II is made up of the Contra Costa County Flood Control detention basin, which consists of 19.24 acres, will potentially add 2-3 sports fields. The total project estimated cost is $15 million. The project is included in the City of Brentwood's FY 2022/23 - 2026/27 Capital Improvement Program (CIP). As of July 11, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated from 2022 to 2024. Construction is anticipated to be compledted in 2023/2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Park/Playground, Renovation, Athletic Facility, Renovation, Misc. Recreational, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents