Similar Projects
FY20 Neches Salt Water Basin Stop Logs
Design
$1,000,000 to $5,000,000 est. value
Beaumont, TX 77703

Mcfaddin National Wildlife Refuge Beach Restoration Phase 2
Bidding
$55,400,000 to $66,800,000 est. value
Sabine Pass, TX 77655

Repair Seven (7) Drainage Pump Stations
Post-Bid
Port Arthur, TX

USACE Galveston District, Sabine Neches Waterway PA11 Containment Dike Raise in Jefferson County, Texas
Post-Bid
$1,000,000 to $5,000,000 est. value
Beaumont, TX

Atlantic Canal Crossing Improvements 2nd Street thru 12th Street
Results
$5,180,000 est. value
TX

Center Street Ditch Cleaning Project
Results
$37,500 est. value
TX

Placement Area 18 Levee Project
Post-Bid
Port Arthur, TX 77642

Z--IDIQ for Stream Gage Site Rprs, Oklahoma and Texas
Results

On-Call Plumbing/Sewer and Drain Services
Term Contract
Post-Bid
Port Arthur, TX 77640

Sabine Pass Area Drainage System Select Ditch Cleanout
Results
Sabine Pass, TX 77655

Placement Area 9 Levee Project
Post-Bid
Port Arthur, TX 77642

Beaumont Municipal Airport Ditch Cleaning and Repair Project
Results
Less than $97,000 est. value
Beaumont, TX

Placement Area 26 Levee Construction Project
Post-Bid
Port Arthur, TX 77642

Improvements to Cathodic Protection System for Bulkhead at Berths 3 & 4
Post-Bid
Port Arthur, TX 77640

Improvements to Shamrock Ditch and Rodair Lateral 3
Post-Bid
Port Arthur, TX 77642

Last Updated 10/07/2020 01:34 PM
Project Title

Port Arthur Hurricane Flood Protection Project (HFPP) Harvey Repairs in Jefferson County, Texas.

Physical Address View project details and contacts
City, State (County) TX   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Information: This project will consist of repairing levee embankment slope failures, and replacing damaged pump station equipment in the city of Port Arthur, Texas. There are 5 different locations for the levee embankment slope failures all located within a 10 mile radius. This work will include removing existing disturbed soil from the levee and rebuilding the slope following moisture and compaction specifications. A portion of the existing disturbed soil will not be reused in the reconstruction of the levee, but instead disposed of following any federal/state laws. Any additional soils needed to complete the final grading will be transported to site from commercial barrow source. The reconstructed levee surface will then be sodded to restore vegetation coverage. There are 2 different location for the pump station repair work located 5 miles from each other. This work will include purchasing required replacement equipment, removing existing damaged equipment, and installing required replacement equipment at designated spot. The location for replacement equipment my not be the same as the original therefore measurements should be taken to purchase any additional supplies to complete the job. Damaged equipment will then be turned over to the local levee sponsor, or disposed of following any federal/state laws.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents