Similar Projects
Copeland Street Water Main Replacement - C67402215 - City Of Petaluma
Alteration
Conception
$1,250,000 est. value
Petaluma, CA 94952

Water Main Replacement At Washington At Highway 101- City of Petaluma
Infrastructure
Conception
$375,000 est. value
Petaluma, CA 94953

Clearwater at Windsor
New Construction, Infrastructure - 26,750 SF
Design
$74,000,000 CJ est. value
Windsor, CA 95492

Northpoint Commerce Center
New Construction, Infrastructure - 114,884 SF
Design
$12,500,000 CJ est. value
Santa Rosa, CA 95407

Replace Curb Ramps, Sidewalk, Driveway, Lighting and Signal
Infrastructure
Bidding
$6,700,000 CJ est. value
Sebastopol, CA 95472

Laguna Treatment Plant Filter Cells 9-14 Valve and Actuator Replacement
Infrastructure
Bidding
$1,627,000 CJ est. value
Santa Rosa, CA 95407

Santa Rosa Avenue Corridor Improvements
Infrastructure
Post-Bid
$1,288,000 CJ est. value
Santa Rosa, CA 95401

Santa Rosa Avenue Corridor Improvements
Infrastructure
Post-Bid
$1,288,000 CJ est. value
Santa Rosa, CA 95401

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Cleveland Avenue and Street Rose District Sewer and Water Improvements
Infrastructure
Results
$1,772,965 CJ est. value
Santa Rosa, CA 95401

Fountaingrove Apartments
New Construction, Infrastructure
Construction
$90,000,000 CJ est. value
Santa Rosa, CA 95403

Cotati Hotel
New Construction, Infrastructure
Construction
$38,000,000 CJ est. value
Cotati, CA 94931

Lago Fresca Apartments
New Construction, Infrastructure - 72,535 SF
Pending Verification
$20,000,000 CJ est. value
Santa Rosa, CA 95405

Richardson Street Mixed-Use Building
New Construction, Infrastructure - 4,200 SF
Pending Verification
$12,000,000 CJ est. value
Windsor, CA 95492

Bodega and Webster Water Main Replacement - C67502012 - City Of Petaluma
Infrastructure
Conception
$2,100,000 est. value
Petaluma, CA 94952

Last Updated 02/15/2024 03:05 PM
Project Title

Fire Damaged Roadway Landscaping

Physical Address View project details and contacts
City, State (County) Santa Rosa, CA 95401   (Sonoma County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $6,009,025 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Response Format Paper Project Type IFB Response Types Line Items Subcontractor Bid Bond General Attachment Type of Award Lump Sum License Requirements A Online Q&A No This is a fire recovery project resulting from 2017 Tubbs Fire. The primary focus is to replace the fire damaged irrigation systems in Coffey Park and Fountaingrove neighborhoods. The scope of work includes the clearance of the existing vegetations, tree removal due to obstruction of the proposed irrigation system, install new irrigation, and finishing with planting new vegetation within the impacted areas.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents