Similar Projects
2022 Water System Improvements Phase II
Infrastructure
Bidding
$690,000 CJ est. value
Easton, MN 56025

2023 Street and Utility Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Brooklyn Center, MN 55429

Concrete Work
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Cottage Grove, MN 55016

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Concrete Pavement Rehabilitation, Bituminous Surfacing
Results
MN

CSAH 2 Concrete Rehabilitation and ADA Improvements
Infrastructure, Alteration
Results
$848,117 est. value
MN

SPPS Jie Ming Mandarin Immersion Part 3 BP #3
Renovation
Construction
$3,000,000 CJ est. value
Saint Paul, MN 55116

Jie Ming Mandarin Immersion Addition and Renovation - Part 2 Earthwork, Utilities, Building Demolition
Infrastructure - 20,000 SF
Construction
$1,086,550 CJ est. value
Saint Paul, MN 55116

RST Runway 3/21 Phase 3: 90th St SW and 31st Ave SW Relocation
Infrastructure
Bidding
$4,161,580 CJ est. value
Rochester, MN 55902

Concrete Season Supply
Term Contract
Post-Bid
Rochester, MN

2022 Random Concrete Repairs
Infrastructure, Alteration
Results
Saint Louis Park, MN

AS/SVE Remediation System Installation
Demolition, Infrastructure
Bidding
$420,000 CJ est. value
Saint Stephen, MN 56375

Concrete Repair and Maintenance
Alteration
Post-Bid
MN

2022 Miscellaneous Concrete Work
Alteration
Results
Faribault, MN

Last Updated 06/29/2023 06:34 AM
Project Title

2023 18 th Street NE Improvements

Physical Address View project details and contacts
City, State (County) Little Falls, MN 56345   (Morrison County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $855,344 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Major quantities for the Work include: 2023 18th Street NE CRVST Trail Improvements 1,555 CU YD Common Excavation 620 CU YD Aggregate Base (CV) Class 5 448 TON Type SP 9.5 Wearing Course Mixture (3,B) 1,535 SQ FT Modular Block Retaining Wall 1,035 SQ FT 6-Inch Concrete Walk 2023 18th Street NE Improvements 20,465 SQ YD Mill Bituminous Surface (2,0") 2,985 TON Type SP 9.5 Wearing Course Mixture (3,B) 2,537 LIN FT 4-Inch Concrete Walk Paper Bids shall be on the form provided for that purpose and according to the Bidding Requirements prepared by the City of Little Falls dated March 27, 2023. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. A Contractor responding to these Bidding Documents must submit to the City/Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. This Work shall be subject to minimum wages and labor standards in accordance with State prevailing wages. The Project, of which the Work under the Contract Documents is a part, is generally described as follows: Bituminous paving, concrete median, pedestrian flasher system, bituminous trail. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents