Similar Projects
Holton Harris Road Bridge
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Anacoco, LA 71403

Tactical Vehicle Maintenance Facility (TEMF), Building 2826, Fort Johnson, Louisiana
Infrastructure
Design
$25,000,000 CJ est. value
Fort Polk, LA 71459

Rehabilitation of Sewer Pump Stations and Wastewater Treatment Plant
Infrastructure, Renovation
Bidding
$2,600,000 CJ est. value
New Llano, LA 71461

Alta Road Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$696,942 CJ est. value
Bell City, LA 70630

RFQ D/B - Fort Polk UEPH (Barracks)
New Construction, Infrastructure
Post-Bid
$100,000,000 CJ est. value
Fort Polk, LA 71459

2022 District 7, 9 Road Improvements
Infrastructure
Results
$2,493,427 CJ est. value
Mandeville, LA 70448

2022 Street Rehabilitation
Infrastructure
Results
$294,819 CJ est. value
Leesville, LA 71446

Koppers Utility and Industrial Products Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Fort Polk, LA 71459

Fort Johnson Job Order Contract (JOC)
Term Contract
Design
Fort Polk, LA 71459

Repair Toledo Bend Rec Site
New Construction - 2,000 SF
Post-Bid
$5,000,000 est. value
Leesville, LA

Water Sector Program Welcome Cemetery Road & Clipper Lane Water Line Replacement
Infrastructure
Results
$151,429 CJ est. value
Simpson, LA 71474

La 399: Bridges Near Fullerton
Demolition, New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fort Polk, LA 71459

Volar Barrack Bldg 1150
Build-out, Renovation
Post-Bid
$500,000 CJ est. value
Fort Polk, LA 71459

La 8: Forker Creek Bridge
Demolition, New Construction, Infrastructure
Design
$7,500,000 CJ est. value
Fort Polk, LA 71459

Dusenbury and Engineer Lake Embankment Dam Road Repairs
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Fort Polk, LA 71459

Last Updated 12/20/2023 06:33 AM
Project Title

Fort Polk Joint Operations Center Phase 2

Physical Address View project details and contacts
City, State (County) Fort Polk, LA 71459   (Vernon County)
Category(s) Government/Public, Green Building, Heavy and Highway
Sub-Category(s) LEED Certified, Military Facility, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

17213 Questions and/or comments relative to these documents should be submitted via email or mailed to: Contract Specialist (Primary POC) U.S. Army Corps of Engineers, Fort Worth District ATTN: Joshua W. Robinson Federal Building 819 Taylor Street, Rm 2A17 Fort Worth, Texas 76102-0300 Phone: (817) 886-1055 Fax: (817) 886-6403 Email: joshua.w.robinson@usace.army.mil Description: This project is the design/build construction of one (1) Joint Operations Center (JOC) Building and supporting facilities. Project includes an operations center with simulation, training control, and planning space; a Secure Area; an administrative area divided into specified security zones; and Plans/EMC area. Project incorporates loading dock/service areas, special foundations, building information systems, fire protection and alarm systems, Intrusion Detection System (IDS) installation, securitized fenestration systems, Access Control System (Electronic keycard) installation, Closed Circuit Television (CCTV) installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include secure organizational and non-organizational vehicle parking, Tactical Vehicle Area, site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, pavement and utility demolition, landscaping and signage. Heating and air conditioning will be provided by a self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards shall be provided. CLAFTPTC-DI90001 General contractors have been pre-qualified and invited to bid this project from a previous Step 1 approval process in 2022. Please direct bids/inquiries to the GC bidders. Addendum #1-#12 have been issued as of 12-11-2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents