Similar Projects
Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

South Aircraft Parking Ramp Pavement Rehabilitation - City of Fullerton
Alteration
Conception
Less than $2,200,000 est. value
Fullerton, CA 92833

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Anaheim, CA 92801

Modify Striping and Signs, Update Curb Ramps and Signals
Infrastructure
Post-Bid
$271,815 est. value
Fullerton, CA

FY 2020/2021 Annual Roadway Resurfacing Project
Alteration
Post-Bid
Dana Point, CA

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Results
$16,200,000 est. value
CA

San Clemente Campground Asphalt Repairs
Infrastructure
Results
$20,000 est. value
San Clemente, CA 92672

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Prospect and Spring Right Turn Lane Modification
Term Contract
Post-Bid
Orange, CA 92869

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

Victoria Avenue Corridor Development - City of Costa Mesa
Alteration
Conception
$1,250,000 est. value
Costa Mesa, CA 92627

Last Updated 02/13/2023 06:04 PM
Project Title

2022 Residential Slurry Seal

Physical Address View project details and contacts
City, State (County) Mission Viejo, CA 92692   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Type 1 and Type 2 RPMS Slurry Seal and Crack Filling of Residential Streets Proposals must be accompanied by a proposal guarantee consisting of a certified check or bid bond payable to the AGENCY in the minimum amount of ten percent (10%) of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a Contract is awarded fails or refuses to execute the Contract Documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall be forfeited to the AGENCY. The proposal guarantees of all bidders will be held until the successful bidder has properly executed all Contract Documents. The Performance and Payment Bonds shall be submitted before execution of the Contract. The Performance Bond shall be not less than 100% of the total amount of the bid price named in the Contract. The Payment Bond shall be not less than 100% of the total amount of the bid price named in the Contract. The AGENCY reserves the right to reject any bond if, in the opinion of the AGENCY Attorney, the Surety's acknowledgment is not in the form included in the Contract Documents or in another form substantially as prescribed by law. The award of contract, if made, will be to the most responsible Bidder as determined solely by the City, pursuant to the City's Plans, Specifications and Contract Documents and in the best interests of the City pursuant to law. At the time of contract award, the successful bidder shall hold the contractor's license(s) required in Notice Inviting Bids. Additionally, the AGENCY reserves the right to reject any or all Proposals, to accept any bid to waive any irregularity if allowed by law, and to take the bids under advisement for the period of time stated in the "Notice Inviting Bids," all as may be required to provide for the best interests of the AGENCY. In no event will an award be made until all necessary investigations are made as to the responsibility and qualifications of the bidder to whom the award is contemplated. Failure to timely submit a Claim, failure to include a Claim in the above Claim summary, or failure to comply with any of the Claim requirements in the Contract, including but not limited to this Article 4, will act as a complete waiver of Contractor's rights to (a) recover money or time on the issues for which a Claim was required, (b) submit a Government Code Claim for the money or time (see below), and (c) initiate any action, proceeding or litigation for the money or time, regardless of the merits, as Contractor will not have satisfied a condition precedent or exhausted administrative remedies. City does not have an obligation to reject the Claim for a failure to comply with any of the Claim requirements in the Contract, including the lack of certification; and any failure by City to reject, or any delay in rejecting, a Claim on that basis does not waive the City's right to reject the Claim on that basis at a later time. In no event may the Contractor reserve its rights to assert a Claim for a time extension or additional money beyond the timelines set forth in this provision unless the City agrees in writing to allow the reservation. "Completion" and "Complete"--Statutory definitions of "Completion" and "Complete" shall apply for those statutory purposes (for example, see Public Contract Code Section 7107 for release of retention, and Civil Code Section 9200 for stop payment notices and notice of completion). For all other purposes, including accrual of liquidated damages, claims, and warranties, "Completion" and "Complete" mean the point in the Work where (1) Contractor has fully and correctly performed all Work in all parts and requirements, including corrective and punch list work, and (2) City's representatives have conducted a final inspection that confirmed this performance. Substantial, or any other form of partial or non-compliant, performance shall not constitute "Completion" or "Complete." LIQUIDATED DAMAGES [Replace last sentence of first paragraph with the following:] For each calendar day the Work is not Complete in excess of the time specified in the Contract for Completion of the Work, as adjusted in accordance with Subsection 6-6, the Contractor shall pay to the Agency, or have withheld from monies due it, the sum of One Thousand Dollars ($1,000.00). [Replace first sentence of the last paragraph with the following:] Execution of the Contract shall constitute agreement by the Agency and Contractor that $1,000.00 per day is the minimum value of the costs and actual damage caused by the failure of the Contractor to Complete the Work within the allotted time. Liquidated damages against the Contractor, whether already accrued or estimated to accrue in the future; Complete sets of said Contract Documents may be obtained by emailing Rich Schlesinger, City Engineer at rschlesinger@cityofmissionviejo.org Please provide detailed bidders info in email. The email will be used to establish the "bidders list." For additional information, contact Richard Schlesinger, City Engineer at 949 470-3079 or rschlesinger@cityofmissionviejo.org.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents