Similar Projects
Millwright Services
Term Contract
Sub-Bidding
Cedar Rapids, IA 52401

Guardrail Repair
Term Contract
Sub-Bidding
$250,000 CJ est. value
Lamoni, IA 50140

RecPlex Snow Removal and Ice Control Services
Renovation, Term Contract
Post-Bid
West Des Moines, IA 50266

Integrated Pest Management Service
Term Contract
Post-Bid
Iowa City, IA 52246

Pabst Wetland And Stream Mitigation Bank
Term Contract
Results
Eldora, IA

Water System Improvements
Term Contract
Post-Bid
Storm Lake, IA 50588

Janitorial at Neal Smith NWR Iowa Ppr1022541
Term Contract
Post-Bid
Prairie City, IA 50228

Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Post-Bid
$25,000,000 CJ est. value
Johnston, IA 50131

Janitorial Services for the Terminal Building
Term Contract
Post-Bid
Cedar Rapids, IA 52404

Des Moines River Basin, Lake Red Rock Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Post-Bid
$25,000,000 CJ est. value
Knoxville, IA 50138

Provide Snow and Ice Plowing and Removal at the Public Parking Lot and Other Landside Areas
Term Contract
Post-Bid
$50,000 CJ est. value
Cedar Rapids, IA 52404

Cleaning Services at the Waterloo, IA Drivers License Station
Term Contract
Post-Bid
Waterloo, IA 50702

Trash and Recycling Disposal
Term Contract
Post-Bid
Marshalltown, IA 50158

Last Updated 08/22/2022 12:34 PM
Project Title

Ashton Maintenance Garage Boiler Replacement Project

Physical Address View project details and contacts
City, State (County) Sibley, IA 51249   (Osceola County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Cuttoff Date & Time 8/17/2022 02:00:00 PM (ET) Overview: The Rockwell City Maintenance Garage and Brine building need the glycol system flushed, cleaned, and new 50% glycol provided and installed so the existing boilers can produce heat properly. Vendor to provide and install all materials and labor needed. Once flushed, vendor to clean out and prep all lines, filters, etc. prior to installing new glycol. Vendor to properly dispose of all waste and debris according to local codes and environmental requirements. Base of design for Glycol: Dowfrost HD 50% (suited for applications exposed to temperatures between -28F and 325F (-33C and 162C)). System to be tested to confirm working ability once all work is completed and weather allows. Local garage staff to be notified of continuous maintenance requirements. Original as-built plans, heating specification, and in-floor heat submittal attached for reference. All existing conditions to be field verified. Contractor to provide training on operation and maintenance requirements. Contractor to be a licensed Plumber in Iowa. This project is exempt from state sales tax. Davis-Bacon wages do not apply Award: It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. All questions related to this project are to be submitted through the IONwave Bid system through the cut off period for question submissions. The Iowa DOT is exempt from sales tax. Sales tax is not to be included in your bid amount. IADOT - Rockwell City Maintenance Garage and Brine Building Glycol System Flush

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents