Similar Projects
Seminole Road Landfill Cell Construction Phase 3, Unit 2, Cell 3N And Unit 4, Cells 4N and 5N
Alteration
Bidding
Ellenwood, GA 30294

Eco-Stations Construction
New Construction, Infrastructure
Bidding
GA

Natural Gas System Replacement - Park Ave
Post-Bid
Fort Valley, GA 31030

Repair Plan for The Highway 49 North 3 Landfill
Post-Bid
GA

Propane Air Mix Plant Emergency Reserve
Results
Robins Afb, GA

Deans Bridge Road MSW Landfill 2020 Phase IIC Closure and Phase III Partial Closure
Results
Augusta, GA 30901

New Transfer Station
New Construction
Construction
Less than $2,635,000 est. value
Alpharetta, GA

Landfill Cover Material
Term Contract
Bidding
Savannah, GA

Phase I (MSW) - Waste Mining and Phase III (C&D) - Cell Nos. 9 & 10
Post-Bid
Thomasville, GA

Decommission and Remove Terminal Underground Fuel Tank
Results
Savannah, GA 31408

Water, Sewer, and Gas Main Extensions
Infrastructure
Bidding
Less than $1,550,000 est. value
Donalsonville, GA 39845

Fuel Pumps And Controls
Post-Bid
Columbus, GA 31901

Water Clarifying Unit - Hall County Landfill
Results
Gainesville, GA 30501

AGS Fuel Farm Rehabilitation - Jet A Tanks
Alteration
Bidding
Augusta, GA

Fuel Management System
Post-Bid
Springfield, GA

Reported 03/16/2022 12:00 AM
Project Title

2022 Gas Collection and Control System (GCCS) Expansion at Seminole Road MSW Landfill

Physical Address View project details and contacts
City, State (County) GA   (DeKalb County)
Category(s) Environmental, Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines, Landfill
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Construction staking/system layout/surveying prior to construction. 2. Installing below grade Polyvinyl Chloride (PVC) landfill gas (LFG) extraction wells. 3. Installing below grade high-density polyethylene (HDPE) LFG laterals and header, air supply line, and liquid conveyance line. 4. Installing header isolation valve, air line isolation valves, and liquid conveyance line isolation valves, cleanouts, and air release valves. 5. Installing gas wellheads, including fittings, valves, tubing, hoses, clamps, regulators and filters, and related appurtenances. 6. Installing new pumps, including tubing, clamps, and related appurtenances. 7. LFG well abandonments. 8. Abandonment in-place of limited sections of the existing GCCS. 9. Connection of the GCCS Expansion to the existing GCCS. 10. Installing below grade high-density polyethylene (HDPE) dual contained dewatering discharge lines above the synthetic cap in Phase 2A of the Landfill along with other related GCCS appurtenances including liquid conveyance line isolation valves, cleanouts and air release valves. 11. System start-up and testing

Details

Division 02 - Existing Conditions, Subsurface Investigation, Landfill Construction and Storage.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents