Similar Projects
Babcock Trail Apartments
New Construction - 67,766 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Inver Grove Heights, MN 55077

Upper Harbor Terminal Park Masterplan
New Construction, Infrastructure
Conception
$5,000,000 est. value
Minneapolis, MN

Ardan Place Housing Development
New Construction
Design
Rosemount, MN 55068

Lake Minnetonka Care Center
Demolition - 17,983 SF
Design
Minnetonka, MN 55345

Dakota Homeland Frames Interpretive Features
Infrastructure
Bidding
$110,000 to $278,000 est. value
Burnsville, MN 55337

Final Closure Construction
Infrastructure
Bidding
Madison, MN

Inspection and Cleaning of Sanitary and Storm Water Piping
Term Contract
Post-Bid
Moorhead, MN 56563

Talahi and Kennedy Site Improvements 2021
Post-Bid
Waite Park, MN

Petroleum Soil Excavation
Results
$300,000 est. value
Elbow Lake, MN 56531

2020 Pond Cleaning
Renovation
Results
$110,000 est. value
West Saint Paul, MN 55118

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Erik's Transmission
New Construction - 1,056 SF
Construction
MN

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

Harvest Housing Development
New Construction
Design
Chaska, MN 55318

Sport Courts and Site Improvements at Dickman Park
Renovation, Infrastructure
Bidding
Minneapolis, MN 55413

Last Updated 03/29/2022 12:55 AM
Project Title

Regional Drinking Water Project Contract A - Wells 7 and 8 Construction

Physical Address View project details and contacts
City, State (County) Cloquet, MN 55720   (Carlton County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Two municipal 12” diameter screened wells, each with an estimated depth of 120 feet constructed by the dual-rotary driven casing method, temporary water supply system connections, tree clearing and grubbing (approximately 3.6 acres), construction access road construction (approximately 1,000 feet), erosion control, electrical, erosion control, and miscellaneous construction.

Details

Site Development, 156,816 SF Renovation, 1 Lots, 3.60 Acres.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents