Similar Projects
Reported | 12/22/2018 12:00 AM |
Project Title | Vertical Construction Contract |
Physical Address | View project details and contacts |
City, State (County) | State-Wide: AL, FL, GA |
Category(s) | Government/Public |
Sub-Category(s) | Misc. Buildings |
Contracting Method | Competitive Bids. |
Project Status | Accepting Letters of Interest |
Bids Due | View project details and contacts |
Estimated Value | $1,000 to $1,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Mobile District Corps of Engineers has a need for a one MATOC pool that will contain a full range of vertical construction, renovation, repair, and some incidental design task orders for general construction primarily supporting the work to be performed at ten (10) locations and associated facilities as follows. 1. Alabama River Lakes, AL. 2. Allatoona Lake, GA. 3. Black Warrior and Tombigbee Rivers, AL. 4. Buford Dam and Lake Sidney Lanier, GA. 5. Carters Dam and Lake, GA. 6. Jim Woodruff Lock and Dam and Lake Seminole, AL, FL, & GA. 7. Okatibbee Lake, MS. 8. Tennessee Tombigbee Waterway, AL, & MS. 9. Walter F. George Lock and Dam, AL, & GA. 10. West Point Dam and Lake, GA, & AL. 11. Panama City, FL. 12. Irvington, AL. This contract is intended to provide for a quick, cost effective response to requirements for a full range of vertical construction, repairs and design/build, task orders for general construction primarily in supporting the Mobile District's requirements at locations described above. Potential projects include, but are not limited to new construction, incidental design/repair/rehab/install of Project Management Offices, Powerhouse, Maintenance Facility, Operations Area, boathouse, bathhouses, washhouses, gatehouses, toilets, shops, fencing, , playground equipment, bulletin boards, game courts, fire and security systems, picnic sites and campsites, courtesy docks, wooden bridges, HVAC, roofs, siding, boat storage sheds, bank stabilization/placement of rip-rap, repair/repaint spillway gates. | ||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |