Similar Projects
Pierson Drain Improvements Phase I
Infrastructure
Bidding
Fort Wayne, IN

2021 Helen P. Brown Natatorium Bulkhead Replacement
Post-Bid
Fort Wayne, IN 46806

Ladig No. 2 Drain Reconstruction
Infrastructure
Post-Bid
Fort Wayne, IN

Northway Drive and Southway Drive Culvert Replacement
Results
Fort Wayne, IN 46800

North Washington Road Drainage Improvements
Results
Fort Wayne, IN 46800

Quantity Purchase Award (QPA) Agreement for High Density Polyethylene and Profile Wall PVC Pipe Liner
Term Contract
Post-Bid

Diane Drive Drainage Improvements and Water Main Replacement
Results
Fort Wayne, IN 46800

Aluminum Box Culverts
Term Contract
Post-Bid
Fort Wayne, IN

Small Structure Pipe Lining
Results
IN

Various Types of Corrugated Metal and Plastic Pipe for the Year 2022
Term Contract
Post-Bid
IN

Shank Tile Drain
Results
IN

Franke Park Drainage Improvements
Results
Fort Wayne, IN 46808

HDPE Pressure Utility Piping
Results
Fort Wayne, IN

Oaks Tile Repair
Infrastructure
Results
Fort Wayne, IN

Prairie Meadows Tile Repair
Infrastructure
Results
Fort Wayne, IN

Last Updated 02/25/2022 11:03 AM
Project Title

Heather Ridge and Aboite Center Road Drainage Improvements

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46895   (Allen County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace inlets at Blythewood Place on the north side of the cul-de-sac with approximately 125 LF of 12" RCP. Also 120 LF of 24" RCP to provide additional relief in flood events and modify the discharge of the overflow of the detention pond located south of Blythewood Place. this will include a 24" RCP to connect to the 42" storm sewer under Aboite Center Road. Approximately 190 SY or street will need replaced, 40 LF of concrete curb and 10 SY of Concrete Sidewalk will need restored.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents