Similar Projects
Construction Manager at Risk Services for the Expanded Capacity
Post-Bid
Less than $15,000,000 est. value
Boston, MA

Boilers Annual Preventative Maintenance, Service Calls, Parts And Components
Post-Bid
Boston, MA

Operations and Facilities Maintenance Services at the John F. Kennedy Federal Building in Boston, MA
Results
Boston, MA 02203

Boiler Repairs - Barnes Building - 495 Summer Street, Boston, MA 02210
Results
Boston, MA 02210

Boilers Annual Preventative Maintenance Contract
Term Contract
Post-Bid
Boston, MA

Provide Preventive Maintenance - General Bid
Results
Less than $7,128,837 est. value
Boston, MA 02108

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

Massachusetts Information Technology Center, MEP Preventive Maintenance Contract - General Bid
Results
Less than $653,474 est. value
Chelsea, MA 02139

Hydronic Piping, Phase 3, Thomas P. O'Neill Federal Building, Boston, MA
Post-Bid
Boston, MA

Barnstead Laboratory Water Purifcation System
Results
Boston, MA 02129

Purchase and Installation of Drinking Fountains - Various Schools
Post-Bid
Chelsea, MA

Air Compressor System Services
Results
$130,000 est. value
Chelsea, MA

Remove and Replace the Existing 175 Gallons PVI Turbopower Domestic Hot Water Heater
Post-Bid
Less than $38,000 est. value
Winthrop, MA 02152

Boiler Replacement and Associated Repairs at the Hernandez School and Lyndon School - General Bid
Results
Roxbury, MA

Trade Contractor FY20-22 Authority Wide Mechanical Term Contract - General Bids
Term Contract
Results
Less than $2,000,000 est. value
East Boston, MA

Last Updated 01/06/2021 03:51 PM
Project Title

Z--Mechanical System Upgrades

Physical Address View project details and contacts
City, State (County) Boston, MA 02129   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Description: There is a base requirement with 2 options. The base requirement is to remove two existing Air Handling Units (AHU-3 & AHU-4) and one boiler supplying the 1st and 2nd floors of Building 28 and then furnish, install and test one new Air Handling Unit (AHU-3) with two heating coils and two new boilers to supply the first and second floors of Building 28. Option A is to remove existing DX Air Handling Unit (AHU-9). Furnish, install and test a new DX Air Handling Unit (AHU-9) supplying the Museum lobby space, including modifications to existing ductwork in the lobby. Option B is to Replace select components of existing AHU-2 in Building 22 Substation. The Museum will remain open for the duration of the contract. Contractor shall have full use of mechanical spaces and chiller area for construction operations during the construction period during normal business hours of the USS Constitution Museum, when Museum staff are present at the site.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents