Similar Projects
Concrete Work for the Mae Meissner Whitaker Park
Infrastructure
Design
$400,000 CJ est. value
Bunker Hill, IL 62014

Install Push Button Actuated Flashing Pedestrian Beacons, Sidewalk Improvements , Signage, and Pavement Markings at Midblock Crossing on Wolf Road
Infrastructure
Bidding
$500,000 CJ est. value
Indian Head Park, IL 60525

U20118 Undergraduate Library Redevelopment
Renovation
Bidding
$32,000,000 CJ est. value
Urbana, IL 61801

Concrete Replacement Work
Alteration
Results
Shelbyville, IL 62565

Pin & Link Assembly Expansion Joint Retrofits 4
Alteration
Results
Chicago, IL

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Construction of Arenzville Rural Water Cooperative Phase III
Infrastructure
Construction
$1,519,702 CJ est. value
Arenzville, IL 62611

Chiarts High School - Playground Pip Resurface
Infrastructure
Bidding
$75,000 CJ est. value
Chicago, IL 60622

Concrete - Various Sites District Wide Plus Alternative Work
Alteration
Results
Algonquin, Carpentersville, IL 60102

2023 Curb and Sidewalk Program
Infrastructure
Bidding
$100,000 CJ est. value
Plainfield, IL 60544

Sidewalk/Driveway/Apron and Curb and Gutter Concrete Replacement
Infrastructure, Alteration
Results
Darien, IL

2022 Concrete Flatwork
Alteration
Results
Lake Zurich, IL

Berg Instructional Center Concrete Repairs
Alteration
Results
Glen Ellyn, IL 60137

Miscellaneous Concrete Repairs
Alteration
Results
Batavia, IL 60510

Lincoln Elementary Drop-Off Canopy
Infrastructure, Alteration
Results
Robinson, IL 62454

Last Updated 07/20/2023 12:22 PM
Project Title

Hma Removal, Pcc Sidewalk Removal and Replacement

Physical Address View project details and contacts
City, State (County) Bourbonnais, IL 60914   (Kankakee County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $531,669 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

City/County Bourbonnais 16,800 Sq Yd Hma Removal, 1114 Sq Yd Butt Joint, 17 Ton Prime Coat, 3405 Ton Hma Surface Mix D, N50, 379 Sq Yd Hma Pavement Patching, 4 Ea. Manhole Adjustments,1140 Sq Ft Pcc Sidewalk Removal and Replacement, 818 Sq Ft Driveway Removal and Replacement, 1404 Sq Ft Heavy Duty Pcc Pavement Removal and Replacement 598 Foot Curb & Gutter Removal and Replacement, 200 Sq Ft Detectable Warnings, and 4 Inlet Frame & Grate Adjustments. Project Location: Various Locations in the Village of Bourbonnais Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - Hma Removal, Pcc Sidewalk Removal and Replacement - 23-00000-00-GM

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents