Similar Projects
Well 7 Construction, Contract 2-2021
Infrastructure
Bidding
$180,000 est. value
Channahon, IL

Well No. 22 (Division A)
Infrastructure
Bidding
$45,000 est. value
Normal, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Well No. 22 (Division B)
Infrastructure
Bidding
$45,000 est. value
Normal, IL

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Mainstream Tarp Pumps Rehabilitation
Results
$19,484,000 to $23,585,000 est. value
Hodgkins, IL 60525

Municipal Water Well Abandonment
Infrastructure
Bidding
$300,000 est. value
Bartlett, IL 60103

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

New Water Treatment Plant for Well House No. 11
New Construction
Results
Freeport, IL

Well No. 4 (610-111)
Infrastructure
Bidding
$436,000 est. value
Pittsfield, IL

Procurement Services Office
Post-Bid
Naperville, IL

Well House No. 3 Improvement
Results
Pearl City, IL

Reported 05/14/2022 12:00 AM
Project Title

Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells

Physical Address View project details and contacts
City, State (County) Alton, IL 62002   (Madison County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a civil project in Alton, Illinois. Completed plans call for site work for a water / sewer project. Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells includes installation of twenty-five (25) partially penetrating relief wells and modifying twenty-five (25) existing D-type relief wells. PERIOD OF PERFORMANCE: 14 months The U.S. Army Corps of Engineers, St. Louis District is seeking firms with demonstrated capabilities and experience for construction services necessary to beprovided for the US Army Corps of Engineers - St. Louis, Missouri. This requirement is for Mel Price Flood Control Project - Reach II. Work includes but is not limited to the installation of twenty-five (25) partially penetrating 10- inch diameter stainless steel relief wells which will be placed in manholes and modifying twenty-five (25) existing D-type relief wells to be placed in manholes. This project will include extensive dewatering features due to elevated groundwater conditions from the Mississippi river, concrete ditch and outlet channel installation, access road installation with geotextile and geogrid in soft soil wetlands, extending existing IDOT storm drains, rip rap and articulated concrete mattress placement, and installation and setup of automated piezometers near Alton, IL immediately upstream from Mel Price Lock and Dam. This project is located immediately downstream of CPL Belchik Road within the drainage area to East Alton No. 1 Pump Station. MBE (14.7%), WBE (6.9%), SBE (100%)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents