Similar Projects
Reported | 05/14/2022 12:00 AM |
Project Title | Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells |
Physical Address | View project details and contacts |
City, State (County) | Alton, IL 62002 (Madison County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Site work for a civil project in Alton, Illinois. Completed plans call for site work for a water / sewer project. Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells includes installation of twenty-five (25) partially penetrating relief wells and modifying twenty-five (25) existing D-type relief wells. PERIOD OF PERFORMANCE: 14 months The U.S. Army Corps of Engineers, St. Louis District is seeking firms with demonstrated capabilities and experience for construction services necessary to beprovided for the US Army Corps of Engineers - St. Louis, Missouri. This requirement is for Mel Price Flood Control Project - Reach II. Work includes but is not limited to the installation of twenty-five (25) partially penetrating 10- inch diameter stainless steel relief wells which will be placed in manholes and modifying twenty-five (25) existing D-type relief wells to be placed in manholes. This project will include extensive dewatering features due to elevated groundwater conditions from the Mississippi river, concrete ditch and outlet channel installation, access road installation with geotextile and geogrid in soft soil wetlands, extending existing IDOT storm drains, rip rap and articulated concrete mattress placement, and installation and setup of automated piezometers near Alton, IL immediately upstream from Mel Price Lock and Dam. This project is located immediately downstream of CPL Belchik Road within the drainage area to East Alton No. 1 Pump Station. MBE (14.7%), WBE (6.9%), SBE (100%) |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |