Similar Projects
1.40 MGD Wastewater Treatment Plant No. 2 Expansion and Lift Station
Addition
Bidding
Humble, TX 77396

HPW - Lift Station Renewal and Replacement
Renovation
Bidding
$13,000,000 est. value
Houston, TX 77282

Inspection, Maintenance, Repair and Related Items of Lift Station
Term Contract
Post-Bid
Less than $220,000 est. value
Houston, TX

WTCPUA Lift Station #14 In-Line Effluent Filter
Renovation
Post-Bid
$62,000 est. value
Austin, TX

Riverwalk Lift Station Reconstruction
Results
Less than $408,700 est. value
Pearland, TX 77581

I-45 Business Park Sewer Line
Results
$1,018,132 est. value
Corsicana, TX 75110

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Citywide Lift Station Repairs (Wooldridge LS and Morgan LS)
Renovation
Construction
$5,524,493 est. value
Corpus Christi, TX 78414

Bird Creek Basin Wastewater Projects
New Construction
Pending Verification
$5,400,000 est. value
Temple, TX

Munn Lift Station Reconstruction
Infrastructure
Bidding
$1,320,000 est. value
Boyd, TX

Miller Ranch Road Regional Lift Station Rehabilitation
New Construction
Post-Bid
Pearland, TX 77584

Falco Booster Station
Results
$750,000 est. value
Dickinson, TX 77539

Lift Stations Rehabilitation - Phase 5 Project
Renovation
Post-Bid
$9,933,508 est. value
San Antonio, TX 78275

Danieldale Pump Station Rehabilitation - Phase 1 Construction
Results
Duncanville, TX 75137

Rebuild Raw Water Transfer Pump and Repair High Service Pump
New Construction
Post-Bid
Port Arthur, TX

Last Updated 03/08/2022 12:12 PM
Project Title

Paul Davis Wellfield Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Tarzan, TX 79783   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Paul Davis Wellfield Pump Station Improvements Project consists of modifications to an existing and operational raw water pump station including selective demolition; two new pumps and motors; two new valve vaults, two new valve actuators, a new flow meter and vault; soil and erosion control; and electrical, I & C work.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents