Similar Projects
Floor Cleaning - Pope Army Air Field
Post-Bid
Fayetteville, NC 28308

Educational Resource Center VCT Replacement
Post-Bid
Fayetteville, NC 28301

NCMA Flooring Replacement - Fort Bragg
Results
Fort Bragg, NC

56--Modular Raised Floor for Operation Center
Results
Fort Bragg, NC 28306

Margaret Willis Elementary School Media Center Replace Carpet with VCT
Post-Bid
Fayetteville, NC 28305

Remove and Replace Flooring, Ceiling Tiles, and Paint Walls - Fayetteville Readiness Center
Results
Fayetteville, NC 28306

VCTY Replacement at Pauline Jones School
Post-Bid
Fayetteville, NC 28301

Massey Hill High School Media Center Carpet Replacement
Alteration
Results
Fayetteville, NC 28306

Floor Stripper and Finish
Post-Bid
Fayetteville, NC 28302

Fort Bragg Floor Repair
Post-Bid
Fort Bragg, NC 28310

Gray's Creek Elementary School - VCT Replacement
Post-Bid
Hope Mills, NC 28348

Hope Mills Middle School - VCT Replacement
Post-Bid
Hope Mills, NC 28348

William H. Owen Elementary School - VCT Replacement
Post-Bid
Fayetteville, NC 28304

Pine Forest Middle School - VCT Replacement
Post-Bid
Fayetteville, NC 28311

Margaret Willis Elementary (Admin Area) - VCT Replacement
Post-Bid
Fayetteville, NC

Last Updated 06/21/2021 04:57 PM
Project Title

Longhill Elementary School Carpet Replacement

Physical Address View project details and contacts
City, State (County) NC   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Replace carpet in Media Center and two offices with VCT SCOPE OF WORK 1. Contractor to remove existing carpet. Floor plan will be provided at the pre-bid. Approximately 3000 sq. ft. 2. Contractor to install 12” x 12” VCT (51899). 3. Up to 10% allowance for accent color tile. 4. Contractor will skim coat surface before installing VCT. 5. Contractor will install 6” black rubber cove base. 6. Contractor will roll all VCT once installed. 7. Contractor will be responsible for disposal of all materials. 8. CCS will remove all furniture as needed. 9. Contractor will check in each day at office before starting work. 10. Contractor will keep area clean and safe at all times.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents