Similar Projects
Replace Security Locks, Doors, Windows, Furnishing and Equipment
Alteration
Bidding
Less than $2,500,000 est. value
Warrenville, IL 60555

Watseka Garage - Replace Windows, Doors and Roofing System
Alteration
Bidding
Less than $700,000 est. value
Watseka, IL 60970

Theatre Concrete Polishing and Terrazzo Installation
Post-Bid
Des Plaines, IL 60016

Highland Flooring Replacement
Post-Bid
Downers Grove, IL 60515

Naperville METRA 4th Avenue Entry Doors & Vestibules
Results
Naperville, IL 60540

Kinzie ES Locker Removal and Replacement
Results
Chicago, IL 60602

Flooring Replacement
Alteration
Bidding
Tolono, IL

Classroom Flooring at McCracken MS & Middleton ES
Post-Bid
Skokie, IL 60076

Harrison Homes Storm Door Purchase & Installation Phase II
Results
Peoria, IL 61605

Demolition and Replacement of Curtain Wall Windows and Doors
Alteration
Bidding
Less than $180,000 est. value
Des Plaines, IL 60018

Restroom Resinous Flooring Replacement
Post-Bid
Romeoville, IL 60446

Carpeting and Painting
Results
Peoria, IL 61602

Salt Dome Floor Repair and Door Improvements
Alteration
Bidding
$90,000 est. value
Carol Stream, IL

McHenry County Jail Shower Epoxy Finish Replacement Services
Post-Bid
Woodstock, IL 60098

Repair/Replacement Overhead Door Headers, Replce Siding, Update Exhaust System and Wash Bays
Results
Springfield, IL 62706

Last Updated 06/25/2021 02:51 PM
Project Title

Spencer Towers Door Lock and Flooring Replacement

Physical Address View project details and contacts
City, State (County) Rock Island, IL 61201   (Rock Island County)
Category(s) Single Trades
Sub-Category(s) Flooring, Windows/Doors
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace door locks to passage sets and deadbolts. Replace selected unit doors. Replace common and mechanical, office, and storage room locksets. Replace elevator lobby flooring with LVT plank flooring on the upper floors.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents