Similar Projects
Transportation Research Building - University of Alabama
New Construction, Infrastructure
Conception
$16,500,000 CJ est. value
Tuscaloosa, AL 35401

Garner Road Cipp Line - 62240280 - 22005 - City of Tuscaloosa
Infrastructure
Conception
$4,300,000 CJ est. value
Tuscaloosa, AL 35405

Hanna Steel Manufacturing Plant Addition
Addition, Demolition, Infrastructure - 9,000 SF
Design
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Kaulton Park Improvements Project
New Construction, Infrastructure
Bidding
$250,000 CJ est. value
Tuscaloosa, AL 35401

Phase 2 -2023 CMP Lining Project
Infrastructure
Bidding
$600,000 CJ est. value
Tuscaloosa, AL 35401

Oliver-Barnard and Tuomey Halls Renovations and Addition - University of Alabama
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Tuscaloosa, AL 35401

RFP Construction Manager - Medical/Psychiatric and Minimum-Security Dormitory addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Tuscaloosa, AL 35401

Law School Drainage Improvements, UA Project
Infrastructure
Results
$1,196,485 CJ est. value
Tuscaloosa, AL 35405

RFQ Contractor - Flint River Drive Parking Lot Improvements
Infrastructure
Results
$497,776 CJ est. value
Tuscaloosa, AL 35404

2021 American Rescue Plan Act, Meter Replacement Project- Contract A, B, C
Infrastructure
Construction
$421,268 CJ est. value
Buhl, AL 35446

Element Hotel / Tuscaloosa
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Tuscaloosa, AL 35401

Peninsula Subdivision
New Construction, Infrastructure
Pending Verification
$3,910,000 CJ est. value
Tuscaloosa, AL 35406

Brooksdale Drive Sanitary Sewer Improvement - 62240280 - 20028 - City of Tuscaloosa
Infrastructure
Conception
$700,000 CJ est. value
Tuscaloosa, AL 35401

Springer Development Subdivision Phase V
Renovation, Infrastructure
Bidding
$1,500,000 CJ est. value
Tuscaloosa, AL 35401

RFQ - New Construction of an Athletics Competition Arena Project Located on Campus
New Construction, Term Contract, Infrastructure
Post-Bid
$183,000,000 CJ est. value
Tuscaloosa, AL 35401

Last Updated 10/03/2023 02:37 AM
Project Title

Mal Moore Athletic Facility- Practice Field Lighting Upgrades

Physical Address View project details and contacts
City, State (County) Tuscaloosa, AL 35401   (Tuscaloosa County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Athletic Facility, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate - 09/25/23
Owner View project details and contacts
Architect View project details and contacts
Description

Prequalification submissions must be received by 5:00 PM local time Tuesday, October 3, 2023. Late submittals will not be accepted. For questions regarding this project, please contact UA Project Manager Lane Weaver/Alexa Moates at 205- 348-0919/205-348-6913 or lrweaver2@ua.edu/acmoates@ua.edu. Completed packets may be submitted by email to: Lane Weaver/Alexa Moates, UA Project Manager lrweaver2@ua.edu/acmoates@ua.edu and Tim Cook Jackson Renfro & Associates tim@jraee.com If necessary, hard copy submissions should be sent to: Lane Weaver/Alexa Moates, UA Project Manager The University of Alabama, Construction Administration 413 Cahaba Circle, Tuscaloosa, AL 35404 and Tim Cook Jackson Renfro & Associates 31 Inverness Center Pkway Suite 300, Birmingham, AL 35242 Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings b. Revisions to details shown on Drawings c. Depths of foundations below first floor d. Locations and depths of underground utilities e. Revisions to routing of piping and conduits f. Revisions to electrical circuitry g. Actual equipment locations h. Duct size and routing i. Locations of concealed internal utilities j. Changes made by Change Order or Construction Change Directive k. Changes made following Architect's written orders l. Details not on the original Contract Drawings m. Field records for variable and concealed conditions n. Record information on the Work that is shown only schematically 3. Mark Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings. 4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location. 5. Mark important additional information that was either shown schematically or omitted from original Drawings. 6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, ASI, RFIs, and similar identification, where applicable.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents