Project Title | Mal Moore Athletic Facility- Practice Field Lighting Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Tuscaloosa, AL 35401 (Tuscaloosa County) |
Category(s) | Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Athletic Facility, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Sub-Bidding, Request for Qualifications, Construction start expected November 2023 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 09/25/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Prequalification submissions must be received by 5:00 PM local time Tuesday, October 3, 2023. Late submittals will not be accepted. For questions regarding this project, please contact UA Project Manager Lane Weaver/Alexa Moates at 205- 348-0919/205-348-6913 or lrweaver2@ua.edu/acmoates@ua.edu. Completed packets may be submitted by email to: Lane Weaver/Alexa Moates, UA Project Manager lrweaver2@ua.edu/acmoates@ua.edu and Tim Cook Jackson Renfro & Associates tim@jraee.com If necessary, hard copy submissions should be sent to: Lane Weaver/Alexa Moates, UA Project Manager The University of Alabama, Construction Administration 413 Cahaba Circle, Tuscaloosa, AL 35404 and Tim Cook Jackson Renfro & Associates 31 Inverness Center Pkway Suite 300, Birmingham, AL 35242 Content: Types of items requiring marking include, but are not limited to, the following: a. Dimensional changes to Drawings b. Revisions to details shown on Drawings c. Depths of foundations below first floor d. Locations and depths of underground utilities e. Revisions to routing of piping and conduits f. Revisions to electrical circuitry g. Actual equipment locations h. Duct size and routing i. Locations of concealed internal utilities j. Changes made by Change Order or Construction Change Directive k. Changes made following Architect's written orders l. Details not on the original Contract Drawings m. Field records for variable and concealed conditions n. Record information on the Work that is shown only schematically 3. Mark Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross-reference on the Contract Drawings. 4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location. 5. Mark important additional information that was either shown schematically or omitted from original Drawings. 6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, ASI, RFIs, and similar identification, where applicable. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |